EMC® VNX5300™ Hardware Information Guide
18
EMC® VNX5300™ Hardware Information Guide
It is important to cable each SPS so that it connects completely to either the A side or
the B side. For example, if you are looking at the SPSs from the rear, they should be
configured as:
◆
SPS A (rear, right side)—Power-out and sense (management) cables connected to
the SP A power supply.
◆
SPS B (rear, left side)—Power-out and sense (management) cables connected to
the SP B power suppy.
Note:
If an SPS is cabled with the SPS sense (management) cable going to the power supply on
SP A and the power-out cable going to the power supply on SP B (or vice versa), an error
condition will occur when the SPS is tested or when it is charging.
Looking from left to right,
shows an example of the rear view of two SPSs (B
and A, respectively).
Figure 11
Example of SPS B and A viewing from left to right (rear view)
SPS LEDs
shows the LEDs located on each SPS (A and B).
Figure 12
SPS LEDs
1
SPS B AC power in (recessed plug)
6
AC power out socket
2
AC power out socket
7
Four SPS A status LEDs (green and amber)
3
AC power out socket to the SP B power supply on
the DPE
8
SPS A to SP A management (RJ-12) connector
4
SPS A AC power in (recessed plug)
9
Four SPS B status LEDs (green and amber)
5
AC power out socket to the SP A power supply on
the DPE
10
SPS B to SP B management (RJ-12) connector
900-XXX-0014 0082
A00
REV
S/N
900-XXX-0014 0082
A00
REV
S/N
SPS B (optional)
SPS A
1
4
7
8
9
10
3
2
6
5
VNX-000282
SPS power
SPS battery
SPS no battery
SPS fault
VNX-000289