29
4.7 MACHINE SET-UP
Follow this procedure to prepare and set-up the
machine at the work site:
1. Use the tow unit to position the Wood Proces-
sor at the work site.
Fig. 13 LOG LOADER ANCHOR BOLTS
IMPORTANT
Position the machine so the prevail-
ing wind/breeze blows the exhaust
gases/fumes away from the opera-
tor's station.
Left and right
Anchor Bolts
2. Crank the drop leg jacks to raise the hitch
coupler and unhook the tow vehicle from the
Wood Processor
3. Adjust the drop leg jacks so the Wood Proc-
essor is level.
4. Remove the nuts from the log loader chute
anchor bolts, one on each side of the chute.
Right Side
Anchor Bolt
Left Side Anchor
Bolt