EM-Technik GmbH - Industriestraße 2 - 67133 Maxdorf - Germany
[email protected]
www.em-technik.com
1
Flow Meter 4Z
Assembly and Operation Instructions
EN
Page 1: ...EM Technik GmbH Industriestra e 2 67133 Maxdorf Germany info em technik com www em technik com 1 Flow Meter 4Z Assembly and Operation Instructions EN...
Page 2: ...cription 4 2 2 Transport and Storage 4 3 Technical Data 4 3 1 Dimensions 4 3 2 Operating Medium 4 3 3 Pressure Guide 4 3 4 Measuring Ranges 5 4 Assembly and Operation 5 4 1 Assembly Instructions 5 4 2...
Page 3: ...Exercise caution for toxic corrosive or hot media residue flowing out of the line or remaining in dead spaces 1 4 General Safety Instructions The fitting must be properly connected to the flexible tub...
Page 4: ...sal requirements environmental protection regulations 3 Technical Data 3 1 Dimensions article no G L H B A 4Z100G0318 1 8 66 104 23 80 4Z200G0318 1 8 77 194 34 160 4Z300G0414 1 4 66 104 23 80 4Z400G0...
Page 5: ...ired for installation and assembly are not included with delivery 4 3 Connect Flow Meter The flow meter must be connected to the pipeline so it is free of mechanical stress The flow meter has a female...
Page 6: ...Use sealant see 4 3 Fitting is leaking Fitting faulty Check fitting for damage and repla ce it if necessary 10 Manufacturer s Declaration Our products do not fall under the scope of the Ma chinery Di...