elysator 100c Operating Instructions Manual Download Page 14

All rights and technical modifications reserved. 

 

The current version can be found at www.elysator.com. 

DE1020

14

8.4. Checking and assessing the condition of the anodes

The sacrificial magnesium anode is located inside the strainer and can be 

checked visually.

•  Anode has a diameter < 10 mm or only a thin steel wire can be seen 

 

Replace the anode.

•  Anode still has a diameter > 10 mm but it is covered with a layer of dirt 

 

Replace the anode. 

•  Anode still has a diameter > 10 mm 

 You can continue to use the anode.

8.5. Replacing the wear indicator and the control button

 (Fig. 7.3.)

1. 

Remove top cover panels (10)

2. 

 Remove contact blade (3) from the blade terminal

3. 

 Loosen flange screw (4) with cable connection

4.   Remove self-tapping screws from duct (14)

5.  Remove duct (14)

6.   Replace wear indicator (2) or control button (13) as appropriate

7.   Refit duct (14) and replace the screws

8.  Tighten flange screw (4) with cable connection

9.  Replace contact blade (3)

10.  Refit top cover panels (10) using the screws

9. Spare parts

Designation

ELYSATOR®

 

Typ 50c

ELYSATOR®  

Typ 75c

ELYSATOR®  

Typ 100c

Anode fittings

101043

101044

101043

Flange gasket

101240

101240

101240

Air vent

100402

100402

100402

Wear indicator

100277

100277

100277

Summary of Contents for 100c

Page 1: ...www elysator com Installation Function Operation Service Operating instructions ELYSATOR Typ 50c 100c...

Page 2: ......

Page 3: ...onnection 8 6 Commissioning 6 1 Filling venting 9 6 2 Setting the throughput 9 7 Operation 7 1 System water 10 7 2 Checking the condition of the anodes 10 8 Maintenance 8 1 Interpreting the indicator...

Page 4: ...4 1 Safety instructions Not drinking water Maximum 100 C Maximum 10 bar pressure 10 bar...

Page 5: ...functions are combined into one appliance pH regulation by means of a sacrificial anode Micro gas bubble separator Magnetic flow filter 3 Standard delivery 2 plug 1 red brass 2 twin connector 1 3 4 r...

Page 6: ...th insulation 2 Indicator 3 Drain valve 4 Vent valve with gasket and coupling 5 Elbow 2x 6 Line regulating valve 7 Shut off valve 2x 8 Coupling 9 Magnet 10 Cover plate 2 part 11 Input 1 2x 12 Output 1...

Page 7: ...E Cylinder diameter 420 mm F Cylinder height 685 mm G Flange diameter 140 mm Input output connection 1 inside thread Drain connection 1 inside thread 4 3 Performance data ELYSATOR Typ 50c ELYSATOR Ty...

Page 8: ...arated out efficiently an installation position close to the diffusion point underfloor heating should be selected The appliances in the ELYSATOR industrial series are designed for installation in a s...

Page 9: ...g the air 6 2 Setting the throughput Set the throughput according to the values in the chart in chapter 4 3 A On indicator 1 mark the reference value for setting the valve B Pull ring 2 to open the sl...

Page 10: ...During operation the ELYSATOR function must be checked every 6 months This is shown on the wear indicator on the duct As long as the wear indicator is in the green zone the anode is operating normally...

Page 11: ...OR and fill it with tap water If after one day with the shut off valves closed the wear indicator reads a higher value than before then the system is OK The ELYSATOR can then be re filled with deminer...

Page 12: ...9 7 Open the drain valve if blocked use a screwdriver or wire to clear it 8 Release the vacuum by pressing on the air valve on air vent connection 4 9 Connect drain 3 to the fresh water supply 10 Fill...

Page 13: ...a size 10 open ended spanner 9 Slide the anodes out from the anode tree 10 Slide new anodes into the anode tree 11 Screw new anodes onto the isolating screw 12 Insert new flange gasket 6 13 Insert the...

Page 14: ...anode 8 5 Replacing the wear indicator and the control button Fig 7 3 1 Remove top cover panels 10 2 Remove contact blade 3 from the blade terminal 3 Loosen flange screw 4 with cable connection 4 Rem...

Page 15: ......

Page 16: ...Service booklet Installer Date of installation Project Device no Sludge removal interval Maintenance interval Date Job Meter mA Company signature...

Reviews: