User Manual QT250 and QT800 gen 2.5, ID 2021 2.3 20. April 2021
Page 35 of 92
Keep hands away from the valve flanges
1.
Apply
multi-purpose corrosion protection grease
on the valve spindle to ease
mounting and avoid corrosion.
2.
Make sure that the valve and actuator are placed in the same position (closed).
3.
Lift the actuator onto the valve; align its valve adapter with the valve spindle
and lower the actuator onto the valve flange.
4.
Ensure that the spindle and valve mounting holes fit directly to the actuator.
5.
In cases where square reducers are needed always insert two pieces with
QT250. The QT800 only has room for one.
6.
Check th
at the actuator is correctly positioned on the valve. The actuator’s
interface box should be placed in the same direction as the piping direction,
see
If square reducers are needed, see section
on page 32.
7.
Remove the top cover and use the hand wheel to turn the actuator and align
the fastening holes of the valve flanges, see section
8.
Insert the fastening screws and use washers according to specifications. For
screw dimensions see
and
Tighten fastening screws to the specified torque, see
Caution!
Do not lift the actuator by the top cover.
Summary of Contents for QT250
Page 91: ......