background image

6

Installation and commissioning

Temperature Sensor KNX T-UP

 • Date of issue: 06.04.2011 • Technical changes reserved. Errors reserved.

sor board of the sensor. Pin the sensor with the notches on to the metal frame, so that
sensor and frame are fixed.

2.5. Notes on mounting and commissioning

Sensor must not be exposed to water (rain) or dust. This could result in the electronic
being damaged. A relative air humidity of 95% must not be exceeded. Avoid bedewing.

After the bus voltage has been applied, the device will enter an initialisation phase las-
ting 5 seconds. During this phase no information can be received via the bus.

Reviews: