background image

 

5.

 

M

AI NT EN A NC E 

D

E TAI LS

 

 

  

  WARNING!  

 

    Failure to maintain equipment may result in injury or death and/or damage to property and equipment

 

 

    Recommended maintenance to be performed on the operator and gate are as follows:- 
 

Operator performs over 150 cycles a day 

each month 

 

Operator performs between 100-150 cycles a day 

every 2 month 

 

Operator performs between 50-99 cycles a day 

every 4 months 

 

Operator performs between 20-49 cycles a day 

every 6 months 

 

Operator performs under 20 cycles a day 

every 12 months 

 

    Date:  ..........................................................................................  
 
    Site Name: .....................................................................................................................................................  
 
    Site Address: ..................................................................................................................................................  

 

    Before

 

commencing maintenance on the operator, isolate the electrical supply to ensure operator will not run   

    inadvertently. 

 

 

Gate rolls freely when in manual .................................................................................... 

 

 

Gate wheels and guide rollers in good condition ............................................................ 

 

 

Gate stops are installed and in good condition, not loose ............................................... 

 

 

Gate rack is tight & correct clearances between pinion wheel & rack............................ 

 

 

Gate track is not damaged ............................................................................................... 

 

 

Gate operator mounting bolts tight .................................................................................. 

 

 

No oil leaks from gearboxes ............................................................................................ 

 

 

Gearbox mounting bolts/nuts tight .................................................................................. 

 

 

Inside operator and control box clean ............................................................................. 

 

 

‘Baygon’ Surface Spray around operator and control box (not on electronics) .............. 

 

 

All electrical connections tight ........................................................................................ 

 

 

Limit Switches operate in appropriate positions / chain oiled ........................................ 

 

 

External safety devices work effectively / cleaned ......................................................... 

 

 

Electromagnetic lock, if fitted, operates correctly and is clean ...................................... 

 

 

Wash down of control box and cover (particularly near corrosive/sea environments) ... 

 

 

General operation i.e. speed, auto close etc normal ........................................................ 

 

   

 Comments............................ ..................................................................................................... ......

 

     .........................................................................................................................................................  

    ........................................................................................................................................................... 

    Service performed by :......................................................................................................................  
 

 

Reviews: