Elnur Gabarron ECOMBI ECOSSH158 User Manual Download Page 15

Elnur

 

powered by Gabarrón  |  ECOMBI SSH  |  User Guide

15

ECOSSH TROUBLESHOOTING, ERROR CODES AND WHAT TO DO: 

Error

E

rror Reason

Resolution

ECOSSH Does not heat

1.   Check everything is connected    

     and the switch is on at the back  

     right hand side.
2.  Make sure heater is not in frost mode
3.  Ensure nothing is covering the  

     inlets or outlets.
4.  If all above checked call  

     Technical line

ECOSSH does not reach set up 

temperature

1.   Make sure that the adequate  

     temperature is set up.
2.  Check that the balancing  

     element is not turned off in UP08

Keyboard does not respond

If the lock symbol is displayed, the 

keyboard is locked. Hold “+” and “-” 

buttons simultaneously for 3 seconds 

to unlock the keyboard. (See Keyboard 

Lock Section).

ECOMBI SSH does not communicate 

with the G Control Hub

Check the unit is associated. The “Link” 

symbol must be shown on the display 

LCD.  For distances greater than 30 

metres and 2-3 walls, associate first 

the closest unit. Each unit can work as 

signal extender. 
If the “Link” symbol is flashing check 

G-control connection to the network. 

Err1

90°C Registered at the main PCB

Call fitter and get him to check that the 

microtherm panel is fitted correctly. If 

still not fixed please get fitter to call us.

Err2

180°C Registered in the Core

Call fitter and get him to check that the 

microtherm panel is fitted correctly. If 

still not fixed check then possible safety 

cut out has been triggered. If still not 

working then please get fitter to call us.

SC – OC

Core Sensor Error

Please call our technical line

SA - OA

Room Sensor Error

Please call our technical line

Summary of Contents for Gabarron ECOMBI ECOSSH158

Page 1: ...User Guide ECOMBI SSH Digital Smart Storage Heaters ECOSSH158 ECOSSH208 ECOSSH308 ECOSSH408 Please read these instructions carefully before installing or using this appliance for the first time...

Page 2: ...urn controls to off and turn off power to heater circuit at main disconnect panel Do not insert or allow foreign objects to enter any ventilation or exhaust opening as this may cause an electric shock...

Page 3: ...ogramming Temperature level for each time interval 1h of the day Button Press the key to increase different values or scroll through menus Button Press the key to decrease different values or scroll t...

Page 4: ...charging period view page 8 Default programming is Comfort from 07 00 until 22 00 with a default temperature of 21 C Economy from 00 00 until 07 00 22 00 to 00 00 with a default temperature of 18 C To...

Page 5: ...the time is displayed and press button 4 Again using the and buttons you can modify the hour and press button to confirm and move to minutes 5 Repeat step 4 but for the minutes and again press the but...

Page 6: ...NG OPERATION MODE 1 Press any button to get the backlight on 2 Hold the button until Func is displayed Blinking then press 3 Using or buttons you can select one of the 3 Modes 4 Once your desired mode...

Page 7: ...2 Hold the button until Func is displayed Blinking 3 Using or buttons scroll through the menu until you see all three temp icons then press 4 Again using or buttons set your desired temperatures and p...

Page 8: ...our Economy temperature No bar represents the hour is programmed to your Frost protection temperature Please note the heater will not charge during frost protection time intervals 5 Once you have prog...

Page 9: ...and press 4 Press the button until UP02 is displayed then press the button 5 Using the and buttons set the end time of your Off Peak charging period then press the button 6 Press the button until UP03...

Page 10: ...f the balancing element working hours does not exceed this value the storage heater charge level is reduced in the same way This behaviour adapts the consumption to the real thermal needs allowing the...

Page 11: ...ed off peak rate electric period UP03 Ending time of reduced rate electric period UP04 Starting time of the second reduced rate electric period if not available set up 00 00 UP05 Ending time of the se...

Page 12: ...l Hub the discovery mode must be activated Press the associate button at the back of the hub for 3 seconds An orange flashing light every second indicates association mode With the hub in association...

Page 13: ...arting time off peak period 1 00 00 UP03 Ending time off peak period 1 07 00 UP04 Starting time off peak period 2 00 00 UP05 Ending time off peak period 2 00 00 UP06 Charging days of the week Default...

Page 14: ...Heating Element ECOSSH158 Ref 15190875 450W Balancing Heating Element ECOSSHI58 Ref 15190105 600W Balancing Heating Element ECOSSH208 Ref 15190110 900W Balancing Heating Element ECOSSH308 Ref 15190120...

Page 15: ...See Keyboard Lock Section ECOMBI SSH does not communicate with the G Control Hub Check the unit is associated The Link symbol must be shown on the display LCD For distances greater than 30 metres and...

Page 16: ...isplayed on the screen Press the button twice and the version of your ECOSSH will be shown on the display F1 2 F1 4 F2 0 To exit Press the button until you return to the main menu Having the version o...

Page 17: ...ay not be treated as household waste Instead it shall be handed over to the applicable collection point for the recycling of electrical and electronic equipment By ensuring this product is disposed of...

Reviews: