
35
www.gd-elmorietschle.com © Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH
|
Maintenance and repair
Refill cooling water:
a) Release the vent screw (Fig. 13/W
6
) on the cooling water circuit.
b) Fill the cooling water circuit with water-Glysantin-mixture (ratio 70:30) on the ball valve (Fig. 13/W
4
), until
the cooling water escapes through the vent screw (Fig. 13/W
6
).
Close the vent screw (Fig. 13/W
6
)
c) Fill the cooling circuit until its pressure is max.
1.2 bar (g)
.
Check pressure by manometer (Fig. 13/W
2
).
Replace cooling water:
4
), release vent screws (Fig. 13/W
5
, W
6
) and drain old cooling water in a suitab-
le container.
b) Fill air in the pressure compensation tank (Fig. 13/W
3
) to 0.5 bar (g).
c) Release the vent screws on the heat exchanger (Fig. 13/W
5
) and on the cooling water circuit (Fig. 13/W
6
).
d) Fill the cooling water circuit with water-Glysantin-mixture (ratio 70:30) on the ball valve (Fig. 13/W
4
) until
the cooling water escapes through the vent screw (Fig. 13/W
5
) of the heat exchanger.
Close the vent screws (Fig. 13/W
5
).
e) Further fill the cooling circuit until cooling water escapes through the vent screw (Fig. 13/W
6
).
Close the vent screws (Fig. 13/W
6
).
f) Fill the cooling circuit until its pressure is max.
1.2 bar (g)
.
Check pressure by manometer (Fig. 13/W
2
).
Prematic AG, Märwilerstrasse 43, 9556 Affeltrangen www.prematic.ch
Tel. 071 918 60 60, Mail: [email protected]