AM852 Veterinary Anaesthesia machine User’ Manual
18
·
Feed into O2
·
Set flowrate control on middle range.
·
Ensure all of the pressure gauges be reset to zero, except O2.
·
Cut off O2 feed.
·
Ensure O2 pressure decline to zero gradually. With the pressure
debase, the low pressure alarm should ring.
2. Connect pipeline supply air.
3. Check whether the pipe pressure is coincident with the request of the region
where the user locates in.
4.4Test flowrate control
Warning:
·
If N2O is connected, it will flow through the system during the period of test.
Use safe and eligible method to collect and dispose it.
·
Unsuitable mixture gas will harm the animal. If the linkage system can not
supply the suitable proportioned O2 and N2O, the system should not be used.
1. Connect the supply gas pipes to the system. Clockwise rotate all flowrate
regulating switches; ensure to rotate them to the bottom.
2. Open the system power supply breaking road switch.
3. Counterclockwise rotate N2O flowrate regulating switch slowly, ensure
that the flowrate of O2 is increasing and set the flowrate of N2O
according to the following table. The flowrate of O2 must be more than
the minimum limitation.
N2O flowrate
(
L/min
)
the minimum limitation of O
2
flowrate
(
L/min
)
1.5
0.5
3
1
6
2
9
3
دﯾﯾﺎﻣرﻓ ﮫﻌﺟارﻣ.WWW.ELM-FAN.IRتﯾﺎﺳ ﮫﺑ رﺗﺷﯾﺑ دراوﻣ دوﻠﻧاد یارﺑ
To download more items, go to ELM-FAN.IR