background image

ERPB2-8C, ERPB2-8RAC, ERPBV2-8C, ERPBV2-8RAC, LRPB2-8C, LRPB2-8RAC, ERPB2-8C*2C, ERPB2-8C*3C

ERPB2-8GRNC*A, ERPB2-8GRNRAC*A, LRPB2-8GRNC*A, LRPB2-8GRNRAC*A

Page 6

97924C  (Rev. J - 07/16)

Figure 10 - Fountain Body Assembly

Figure 11 - Push Button Assembly

17

3

3

4

4

4

6

7

25

See Fig. 8

13

28

See Fig. 8

14

26

5

15

29

11

16

7

3

Summary of Contents for SWIRLFLO ERPB2-8C

Page 1: ...It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit which res...

Page 2: ...B2 8C 3C ERPB2 8GRNC A ERPB2 8GRNRAC A LRPB2 8GRNC A LRPB2 8GRNRAC A Page 2 97924C Rev J 07 16 LEGEND A 1 4 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 Waste Tube D...

Page 3: ...ushing it until it reaches a positive stop approximately 3 4 19mm on the marked chiller inlet port Connect building supply line to strainer See Figure 3 Caution DO NOT SOLDER tubes inserted into the s...

Page 4: ...the chiller 1 4 O D copper tube Install a 1 4 x 1 4 tee provided on the marked chiller outlet port Insert the 1 4 poly tubing coming from the fountain into the union CAUTION DO NOT SOLDER tubes insert...

Page 5: ...BUBBLER DETAIL NOTE When installing replacement bubbler and pedestal tighten locknut only to hold parts snug in position Do Not Overtighten Basin Figure 8 Bubbler Details 1 or 2 Locknut 10A or 10B Bas...

Page 6: ...PB2 8RAC ERPB2 8C 2C ERPB2 8C 3C ERPB2 8GRNC A ERPB2 8GRNRAC A LRPB2 8GRNC A LRPB2 8GRNRAC A Page 6 97924C Rev J 07 16 Figure 10 Fountain Body Assembly Figure 11 Push Button Assembly 17 3 3 4 4 4 6 7...

Page 7: ...Panel Drain Plug 1 1 2 Poly Tubing Cut To Length Kit Tee 1 4 3 Pack Gasket Drain Assy Drain Tailpipe Screw 5 16 18 x 1 00 HHMS PARTS LIST ITEM NO PART NO DESCRIPTION Installation Package The component...

Reviews: