background image

ERPB2-8C, ERPB2-8RAC, ERPBV2-8C, ERPBV2-8RAC, LRPB2-8C, LRPB2-8RAC, ERPB2-8C*2C, ERPB2-8C*3C

ERPB2-8GRNC*A, ERPB2-8GRNRAC*A, LRPB2-8GRNC*A, LRPB2-8GRNRAC*A 

97924C  (Rev. J - 07/16)

Page 3

Figure 4 - LRPB Tube Routing

 1.

 Install chiller: 

Remove front panel of chiller. 

Remove

    and discard cardboard inner pack from between

    compressor and side panel.

 Slide chiller onto the

     shelf and position it to the left as per dimensions in 

      Figure 1.

        

Note: 

 Building construction must allow for

                   adequate air flow on both sides, top and

                    back of chiller. A minimum of 4” (102mm) on

                    both sides and top is required. See chiller

                    installation for additional instructions.

 2. 

Make

 water supply connections. Install a shut-off valve

    and union connection to building water supply (valve and

    union not provided). Turn on water supply and flush the

     line thoroughly.

 3. 

ERPB Models:

 Make connection between remote chiller

     and building supply line. Inlet port is marked on the chiller

    (1/4” O.D. copper tube). Bend the copper tube (provided)

    at an appropriate length from chiller to opening in frame.

    Install the in-line strainer (provided with chiller) by pushing

     it until it reaches a positive stop, approximately 3/4” (19mm)

    on the marked chiller inlet port. Connect building supply

     line to strainer. (See Figure 3)

                      

Caution: 

DO NOT SOLDER tubes inserted

                                     into the strainer as damage to

                                     o-rings may result.  

   

 4. 

LRPB Models: 

Mount filter head assembly to side of 

     chiller (See Figure 4). Make connections between filter

     and building supply line (3/8” O.D. tube not provided).

     Inlet port is marked on the chiller (1/4” O. D. copper tube).

     Install a 1/4” x 1/4” union (provided) on the marked chiller

     inlet port. Insert the 1/4” poly tubing (provided) into the

     fitting on filter and connect the union to the chiller.

      (See Figure 4)

                     

 Caution: DO NOT SOLDER tubes inserted

                                     into the strainer as damage to

                                     o-rings may result.

 

Special Tools

 

Item  Description Quantity

  

NONE 

Additional Materials

 I

tem  Description Quantity

 

Unplated copper inlet pipe 

 

Service Stop

  

 REQUIRED TOOLS AND MATERIALS

  These tables show special tools and/or

   additional materials (not provided) which are

   necessary to complete installation of these

   units:

Figure 2 - Chiller Installation

CHILLER

INLET

CHILLER

OUTLET

27

26

19

TO BUBBLER

26

Figure 3 - ERPB Tube Routing

TO BUBBLER

26

27

18

26

26

CHILLER

OUTLET

WATER

INLET

Note: Danger! Electric shock hazard. Disconnect power before servicing unit.

 Uses HFC-134A refrigerant

Summary of Contents for SWIRLFLO ERPB2-8C

Page 1: ...It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit which res...

Page 2: ...B2 8C 3C ERPB2 8GRNC A ERPB2 8GRNRAC A LRPB2 8GRNC A LRPB2 8GRNRAC A Page 2 97924C Rev J 07 16 LEGEND A 1 4 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 Waste Tube D...

Page 3: ...ushing it until it reaches a positive stop approximately 3 4 19mm on the marked chiller inlet port Connect building supply line to strainer See Figure 3 Caution DO NOT SOLDER tubes inserted into the s...

Page 4: ...the chiller 1 4 O D copper tube Install a 1 4 x 1 4 tee provided on the marked chiller outlet port Insert the 1 4 poly tubing coming from the fountain into the union CAUTION DO NOT SOLDER tubes insert...

Page 5: ...BUBBLER DETAIL NOTE When installing replacement bubbler and pedestal tighten locknut only to hold parts snug in position Do Not Overtighten Basin Figure 8 Bubbler Details 1 or 2 Locknut 10A or 10B Bas...

Page 6: ...PB2 8RAC ERPB2 8C 2C ERPB2 8C 3C ERPB2 8GRNC A ERPB2 8GRNRAC A LRPB2 8GRNC A LRPB2 8GRNRAC A Page 6 97924C Rev J 07 16 Figure 10 Fountain Body Assembly Figure 11 Push Button Assembly 17 3 3 4 4 4 6 7...

Page 7: ...Panel Drain Plug 1 1 2 Poly Tubing Cut To Length Kit Tee 1 4 3 Pack Gasket Drain Assy Drain Tailpipe Screw 5 16 18 x 1 00 HHMS PARTS LIST ITEM NO PART NO DESCRIPTION Installation Package The component...

Reviews: