Elkay LJNED10 2AQ Series Installation, Care & Use Manual Download Page 4

PAGE 4

LJNED10_2AQ

1000002311 (Rev. D - 05/16)

FILTER INSTALLATION INSTRUCTIONS

1.  Remove front panel of chiller. 

Note:  For color images please visit www.elkay.com.

2. 

Install 3/8" formed copper tube (item 2) to left side of filter head.  Screw locknut hand-tight to seal. See Figures  5 and 18.    

3. 

Mount filter head to chiller using (3) screws (provided).  See Figure 6.  

4. 

Push (1) piece of 3.5" long 1/4" O.D. poly tubing (item 24, provided) into fitting on right side of filter head.  See Figure 7.  

See Figure 1 for operation of quick connect fittings.

5.  Install 1/4" x 1/4" John Guest elbow (provided) to previously installed poly tubing.  Install 3/8" x 1/4" John Guest elbow 

(provided) to evaporator water inlet labeled "WATER IN".  See Figure 8.  

6.  Connect 1/4" John Guest elbow to 3/8" x 1/4" John Guest elbow using (1) piece of 3.5" long 1/4" O.D. poly tubing (item 

24, provided).  Install filter cartridge to filter head.  See Figure 9.  

FIG. 5

FIG. 6

FIG. 7

FIG. 8

FIG. 9

24

24

34

30

2

1

31

13

23

Summary of Contents for LJNED10 2AQ Series

Page 1: ...LD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM To assure you install this model easily and correctly PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING...

Page 2: ...and top of chiller unit 4 102mm minimum required 3 Install rough plumbing to fountain See Figure 4 for location of supply water inlet to chiller and location of waste water outlet 4 Install wall frame...

Page 3: ...OFF VALVE BY OTHERS C 1 1 4 32mm DRAIN TUBE PROVIDED D ELECTRICAL INLET 26 1 2 673mm 11 279mm FINISHED FLOOR 55 1 4 1403mm 24 610mm 16 406mm 18 457mm 8 1 4 210mm 13 1 8 333mm WALL OPENING 26 3 8 670m...

Page 4: ...5 long 1 4 O D poly tubing item 24 provided into fitting on right side of filter head See Figure 7 See Figure 1 for operation of quick connect fittings 5 Install 1 4 x 1 4 John Guest elbow provided to...

Page 5: ...Make connection between chiller inlet and building supply line 3 8 O D copper tube DO NOT SOLDER TUBES INSERTED INTO THE UNIONS AS DAMAGE TO THE O RINGS MAY RESULT See Figure 9 Make connections betwe...

Page 6: ...PAGE 6 LJNED10_2AQ 1000002311 Rev D 05 16 TUBE ROUTING DIAGRAM TO BUBBLER REGULATOR ASSEMBLY SEE FIGURE 16 TO CUP FILLER CHILLER INLET CHILLER OUTLET 3 24 24 31 FIG 11...

Page 7: ...enser approximately 150 lbs or 68 kg 3 Orientate yourself to the configuration of the cup dispenser and remove waste bin Note location of mounting slots in the wall box portion of the cup dispenser se...

Page 8: ...replacement is necessary see parts list for correct regulator part number Actuation of Quick Connect Water Fittings Cooler is provided with lead free connectors which utilize an o ring water seal To r...

Page 9: ...8 24 CP 17 40169C NUT HEX 1 5 16 20UN CP 18 40562C GLASS FILLER 19 97466C BUBBLER ASSEMBLY VR 20 45929C TUBE DRAIN 21 50986C HOLDR REGULATOR 22 51294C ASSY FILTER HEAD 23 51299C ASSY FILTER LK LEAD 24...

Reviews: