background image

98074C (Rev. A - 2/05)

ESRWC8*1H    ESRWC13*1H

PAGE 3

FIG. 3

Stream height is factory set at 35 PSI. If supply pressure varies greatly from this,
remove items 31 and 32 and adjust screw on item 34. Clockwise adjustment will raise
stream and counter-clockwise adjustment will lower stream. For best adjustment, stream
should hit basin approximately 6-1/2" (165mm) from bubbler.

NOTE:
WHEN INSTALLING REPLACEMENT BUBBLER AND
PEDESTAL, TIGHTEN NUT (ITEM 12) ONLY TO HOLD
PARTS SNUG IN POSITION.
DO NOT OVER TIGHTEN.

BASIN

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

HANGER BRACKETS & TRAP INSTALLATION

1

) Remove hanger brackets fastened to back of cooler by removing screws.

2) Mount the hanger brackets and trap as shown in Figure 2.

NOTE:

  Hanger Brackets and trap 

MUST

 be supported securely.  Add fixture support carrier if wall will not provide adequate support.

IMPORTANT:

y

5-1/2 in. (140mm) dimension from wall to centerline of trap must be maintained for proper fit.

y

Anchor hanger securely to wall using all mounting holes.

3) Install straight valve for 3/8" O.D. unplated copper tube.

INSTALLATION OF COOLER

4) Hang the cooler on the hanger brackets.  Be certain the hanger brackets are engaged properly in the frame and wrapper.
5) Remove the access panel on the underside of the cooler and set it aside.
6) Connect water inlet line--See Note 4 of General Instructions.
7) Remove the slip nut and gasket from the trap and install them on the cooler waste line making sure that the end of the waste line fits into the trap.  Assemble the slip

nut and gasket to the trap and tighten securely.

START UP

Also See General Instructions

8) Replace the front panel and secure by retightening all screws.

FIG. 4

10

11

12

8

9

WRAPPER

34

32

33

31

35

36

Reviews: