background image

ECH8GRN_1C          

(630) 574-8484 

 

Elkay Manufacturing Company 

2000000696 (Rev. A - 07/22) 

 

Page 9

6. 

Connect the black wire (B) to hot line and connect 

the white wire (C) to neutral line.

 

 

B

C

7.  Install the front panel to the unit. 

 

8. Start-Up

.

1.  Open supply line valve.
2. 

Purge air from all water lines by operating bubbler 

valve of fountain to which chiller is connected. 

Steady water stream assures all air is removed.

3.  Turn on electrical supply.

9. Service

For proper and safe servicing, please read these 

Caution, Warning instructions completely before 

servicing. 

 

Note: 

Disconnect power supply before servicing the     

 

   unit.

 

         

All service work must be performed by an  

 

 

   authorized service person

.

9.1  Service: Adjustments

9.1.1  Temperature Control

Factory set for 50ºF ± 5º (10ºC ± 5º) water under 

normal conditions. For cold water, adjust screw on 

item no. 12 in clockwise direction.

9.2  Service: Inspection/Cleaning

• 

Inspect the Water Chiller twice each year for proper 

operation and performance.

• 

Inspection of the unit will require disconnecting 

electrical supply, removal of panels, etc. and 

reassembly and return to service practices.

9.2.1  Condenser Fan Motor

Visually check and confirm the condenser fan turns 

freely. If the condenser fan does not spin freely, 

have an authorized service personnel to check and 

replace the fan.

9.2.2  Ventilation

Cabinet louvers and the condenser fins should 

be periodically cleaned with a brush, air hose or 

vacuum cleaner. Cleaning should be done twice 

each year or more frequently if needed due to 

environment. Excess dirt or poor ventilation can 

cause no cold water and compressor cycling on the 

compressor overload protector.

9.2.3  Waterflow

Make sure that the water flow is proper. If water flow 

is slow, then inspect the filter or in-line strainer for 

restriction. Replace the filter cartridge if required. 

Disassemble the in-line strainer and clean if 

required.

9.2.4  Lubrication

Motors should be lifetime lubricated.

9.2.5  Actuation of Quick Connect Water Fittings

Chiller is provided with lead-free plug which utilizes 

an O-ring seal. To remove the plug from Chiller, 

relieve the water pressure, pull the collar towards the 

fitting and then pull the fitting from the tube. To install 

the plug, push the fitting straight onto the tubing 

until it reaches a positive stop, which should be 

approximately 3/4” (19mm). Refer page 10 for quick 

connect fittings.

Screw

Front Panel

Electrical

Box

Summary of Contents for ECH8GRN

Page 1: ...ECH8GRN_1C 630 574 8484 Elkay Manufacturing Company 2000000696 Rev A 07 22 Page 1 ECH8GRN Refrigeration Package INSTALLATION CARE AND USE MANUAL...

Page 2: ...nstallation Preparation Read Before Beginning Installation 7 4 Tools and Supplies 7 4 1 Tools Required 7 4 2 Installer Supplied Parts 7 4 3 Tools Items required but not provided 7 5 Ratings 7 5 1 ECH8...

Page 3: ...Symbol and followed by a signal word such as WARNING or CAUTION 1 3 Definitions DANGER The signal word that indicates a hazard with a high level of risk which if not avoided will result in death or s...

Page 4: ...any maintenance make sure the unit is unplugged and circuit breakers are turned OFF Prior to installation test for live circuits or wiring inside the wall before cutting or drilling into the wall Fai...

Page 5: ...e installed properly by trained service person 2 2 Disclaimer The information contained in this Installation Use Care Manual is given free of charge It is based upon technical data which we believe to...

Page 6: ...4 261mm 17 3 8 441mm 1 3 4 95mm REF C D 1 3 8 35mm 2 50mm A B 13 1 4 338mm 1 25mm 3 3 4 57mm LEGEND A 1 4 O D TUBE WATER OUTLET B 1 4 O D TUBE WATER INLET C TEMPERATURE ADJUSTMENT D ELECTRICAL USES HF...

Page 7: ...uce risk of water damage Thoroughly flush all water lines and fittings of all foreign matter before connecting to chiller If inlet pressure is above 100 psig 0 69 MPa a pressure regulator must be inst...

Page 8: ...louvers on each side of chiller When mounting unit in a cavity or behind a wall maintain a minimum space of 4 102mm on each side 4 102mm on the top and a depth of 12 305mm 6 Water inlet is 1 4 6 mm O...

Page 9: ...ces 9 2 1 Condenser Fan Motor Visually check and confirm the condenser fan turns freely If the condenser fan does not spin freely have an authorized service personnel to check and replace the fan 9 2...

Page 10: ...ring Diagram TUBE IS SECURED IN POSITION SIMPLY PUSH IN TUBE TO ATTACH PUSH IN COLLET TO RELEASE TUBE PUSHING TUBE IN BEFORE PULLING IT OUT HELPS TO RELEASE TUBE Operation of Quick Connect Fittings Fi...

Page 11: ...ll correspondence pertaining to any of the above wa ter chiller or orders for repair parts MUST include model number and serial number of chiller name and part number of replacement part Evaporator Re...

Reviews: