background image

Rev.102212

JA

 

4

 

www.elitescreens.com

 

 

 

 

UP

 

 

St op

 

Down

 

 
 
 

 

 
 
 
 
 

Hardware Parts List for Evanesce Tension B Series 

Please

 

make

 

sure

 

all

 

parts

 

listed

 

below

 

are

 

included

 

before

 

proceeding

 

with

 

the

 

installation.

 

 

Hardware

 

Parts

 

List

 

for

 

above

 

ceiling

 

installation

 

A

B.

 

Suspension

  

Bar

 

x

 

4

 

.

 

Suspension

 

Bracket

 

x

 

2

 

C.

 

End

 

Flange

 

x

 

2

 

C.

 

M8x16mmx1.5mm

  

washer

 

x

 

8

 

D.

 

M6x13mmx2mm

  

washer

 

x

 

8

 

E.

 

M8

 

nut

 

x

 

4

 

F.

 

M6

 

nut

 

x

 

4

 

G.

 

M8x40mm

 

hex

 

screw

 

x

 

4

 

H.M6x20mm

 

screw

 

x

 

4

 

 

Installation Instructions

 

e

 

Aerie

 

Tension

 

Series

 

includes

 

a

 

3

outlet.

 

If

 

your

 

stallation

 

will

 

be

 

entirely

 

concealed

mends

 

a

 

rdwire

 

connection.

 

Please

 

refer

 

to

 

tion.

 

The Evanesce B allows access for above or below ceiling installation. Please follow the instructions 
described in the following steps below for your type of installation. 

 

ower

 

P

Th

Prong

 

Power

 

Cord

 

for

 

use

 

in

 

a

 

non

concealed

 

power

 

 

(including

 

power

 

outlet),

 

Elite

 

Screens

 

strongly

 

recom

the

 

image

 

below

 

for

 

both

 

110v

 

&

 

220v

 

wiring

 

informa

in
ha

 
 

 

4.

   

IR

 

Remote

 

Control:

 

The

 

Infrared

 

functions

 

by

 

direct

 

line

 

of

 

sight

 

contact

 

with

 

a

 

beam

 

range

 

of

 

30

 

feet.

 

5.

   

RF

 

Remote

 

Control:

 

The

 

radio

 

waves

 

eliminate

 

the

 

need

 

for

 

a

 

direct

 

line

 

of

 

sight

 

with

 

a

 

range

 

of

 

100

 

feet.

 

Summary of Contents for Evanesce Tension B Series

Page 1: ...eration direct connection to a properly grounded power source is advised The power outlet supplying power to the unit should be close to the unit and easily accessible Do not install the unit on uneve...

Page 2: ...o comply with the limits for a Class B digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential inst...

Page 3: ...cable that may or may not be provided by the manufacturer of the projector The trigger feature will not work without an output cable from the projector but it can be tested by connecting the Red and...

Page 4: ...n Series includes a 3 outlet If your stallation will be entirely concealed mends a rdwire connection Please refer to tion The Evanesce B allows access for above or below ceiling installation Please fo...

Page 5: ...rew G M8x16mmx1 5mm washers C and M8 shown below d secure each nut E as over the Hanging Bracket A and align with the hole as shown below according to th ght requirement for your installation ar Secur...

Page 6: ...end flange piece C on the edge of the housing as shown below to complete the assembly The sc Dimensions Table For Above ceiling installation reference the reen is now ready for installation Push end f...

Page 7: ...h is ot less than the screen size table A5 Consult the dimensions table on page 9 C1 in regards to accommodating the screen casing The tween 1 Measure and cut the ceiling installation slot The width s...

Page 8: ...rew across th hole of the end cap 8 ck wood beam the M8x40m ure that they xpanding bol the Hanging B y are firmly in readed rods he screen to t e thesocket w n he he d ms stone or mm hexagona y will h...

Page 9: ...ange cover between the gap and the screen to complete the installation Dimensions Table For below ceiling installation reference For local Elite Screens contact or Technical Support please visit www e...

Reviews: