Elite Screens EDGE FREE Aeon AcousticPro UHD Series User Manual Download Page 6

Rev.041717-DR 

                                                   

www.elitescreens.com                                                                                 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screen Material Removal

 

Follow the steps to properly remove the screen material from the frame. This procedure will ensure prolonging the 

life of the screen material. 

 

1.

 

Detach the velcro from the frame.   

2.

 

Gently pull back the material to release the material from the velcro connections on the corners. 

 

 

 

 

 

 

 

Support bar installation (for models under 135”)

:     

1.

 

Position the 

center support bar (E)

 in the middle of the frame and align the hole on each end of the support 

bar with the 

M6 hex screws 

on the top and bottom frames. Then fasten with the 

M6x12 screws. 

 

               

 

 

 

 

 

Pull  back  the screen  material from 

the  velcro  connection  along  the 

edges of the frame to detach it. 

Attach in the following sequence: a-b-c-d 

  Move the 

M6 hex screw 

to the middle area of the frames. 

Support bar 

Summary of Contents for EDGE FREE Aeon AcousticPro UHD Series

Page 1: ...b projector overshoot An optional LED backlighting kit is available for added visual appearance For more information on the LED kit please visit http www elitescreens com led Hardware and Parts List P...

Page 2: ...ng two M5x15 screws 3 Repeat steps 1 and 2 for assembling the second horizontal frame Push Push 4 Insert the elbow joint A into each end of the horizontal frames B as shown below 5 Insert the two vert...

Page 3: ...position The back side of the screen material should be placed upwards Note The back side of the material has the velcro borders all around the edges 2 Carefully and gently place the assembled frame...

Page 4: ...orners have been attached please check whether the frame corners are wrapped by the screen material If not please loosen the velcro connection and repeat the above steps so the frame is not exposed Sc...

Page 5: ...erial Note Represents the screen material Lay the Velcro end on the screen material over the Velcro end of the frame and keep it within the edge Proceed in the following sequence below The key is to a...

Page 6: ...the velcro connections on the corners Support bar installation for models under 135 1 Position the center support bar E in the middle of the frame and align the hole on each end of the support bar wit...

Page 7: ...e top and bottom frames Then fasten with the M6x12 screws Black Backing Installation 1 Lay the Black backing completely flat with the opening side facing down on the white AcousticPro UHD material in...

Page 8: ...he openings The longer rods are used on the vertical edges of the screen material and the shorter rods are used on the horizontal edges as shown below 4 Hook installation 1 Follow steps 1 2 3on Fig 1...

Page 9: ...2 Fig 3 Black mesh backing Fiberglass rods Arrow marks Grasp the Fiberglass rod inside the black backing and press it into the hooks groove This is the proper method to assure the black backing has s...

Page 10: ...he top and bottom of the screen material 2 Without removing the adhesive tape place all the trim pieces along the edge of screen material Adjust the trim so that the top and bottom trim pieces are tou...

Page 11: ...order B C D E F 4 After the bezel trim has been installed place a corner sleeve K on all four corners Begin by aligning and adjusting the corner sleeve through the front of the screen Make sure the co...

Page 12: ...h the proper bit size according to the wood screws included 2 Line up the wall brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver 3 Position th...

Reviews: