Edge Frame Projection Screen
User’s Guide
Rev.10252019MZ
7
Screen Material Removal
1.
Detach the velcro from the frame.
2.
Gently pull back the material to release it from the velcro connections on the corners
Support bar installation (for models under 135”):
1.
Position the
center support bar (E)
in the middle of the frame and align the hole on each end of the
support bar with the
M6 hex screws
on the top and bottom frames. Then fasten with the
M6x12
screws.
Move the
M6 hex screw
to the middle area of the
frames.
Align the M6 screws
with the two holes.
Pull back the screen material from
the velcro connection along the
edges of the frame to detach it.
C
ent
er
Suppo
rt
bar