background image

 Edge Frame Projection Screen

 

 

User’s Guide

 

      

 

Rev.10252019MZ 

 

www.elitescreens.eu

 

 

 

 

Thank you for your purchase of an Elite Screens edge frame projection screen. 

 

 

Hardware and Parts List

 

Please make sure all parts listed below are included before installation. 

 

 
 

 

A. Elbow joint x4 pcs 

B. Top/Bottom horizontal fame x4 pcs 

C. Left/Right vertical frame x2 pcs 

 

 

 

D. Center joints x2 pcs 

E. Center Support bar x1-2 pcs 

F. Wall brackets x2-3 pcs 

 

 

(135”-150”x2pcs) 

 

G. M5x15 screw x24 pcs 

H. M5x50 screws and anchor x6 pcs 

I. Rubber hammer x1 pc 

 

 

 

J. Screwdriver x1 pc

 

K. 

Black Tape x1 bag

 

L. 

Bezel trim x6 pcs

 

 

 

 

M. Corner sleeve x4 pcs

 

 

Summary of Contents for Edge Frame

Page 1: ...ll parts listed below are included before installation A Elbow joint x4 pcs B Top Bottom horizontal fame x4 pcs C Left Right vertical frame x2 pcs D Center joints x2 pcs E Center Support bar x1 2 pcs...

Page 2: ...orizontal frame piece to the center joint and fasten also using two M5x15 screws 3 Repeat steps 1 and 2 for assembling the second horizontal frame Push 4 Insert the elbow joint A into each end of the...

Page 3: ...Guide Rev 10252019MZ 3 www elitescreens eu 6 Join the remaining horizontal long frame B with the frame built in the previous steps as shown below Horizontal long frame B Vertical short frame C Horizon...

Page 4: ...aterial should be placed upwards Note The back side of the material has the velcro borders all around the edges 2 Carefully and gently place the assembled frame on top the screen material as shown bel...

Page 5: ...ame corners are wrapped by the screen material If not please loosen the velcro connection and repeat the above steps so the frame is not exposed Note The black shaded part represents the velcro on the...

Page 6: ...om the frame This procedure will ensure prolonging the life of the screen material Lay the Velcro end on the screen material over the Velcro end of the frame and keep it within the edge Proceed in the...

Page 7: ...tallation for models under 135 1 Position the center support bar E in the middle of the frame and align the hole on each end of the support bar with the M6 hex screws on the top and bottom frames Then...

Page 8: ...rews Notice to Installer Please use the following installation instructions to obtain superior optical performance from the Angular Reflective ALR Ambient Light Rejecting Screen Make sure to follow th...

Page 9: ...ect at the mirror opposite angle it is important to position the projector so that the viewer will get the best possible image Step 1 Establish the general eye level of the viewers Step 2 Set the appr...

Page 10: ...g the edge of screen material Adjust the trim so that the top and bottom trim pieces are touching and show no gaps in the center Note The Elite logo should be positioned on the bottom right Refer to F...

Page 11: ...y aligning and adjusting the corner sleeve through the front of the screen Make sure the corner sleeve completely wraps the edge of the bezel trim This should cover any corner gaps Once all corner sle...

Page 12: ...wall brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver 3 Position the frame screen onto the wall brackets F as shown in below 4 The design of...

Reviews: