Elite Screens AR2 Series User Manual Download Page 6

 

User manual 

AR2

 

(Screw adjustment type)

 

 

Rev. V210929DT

 

Elite Screens China Corp.

 

Screen Material Installation 

1. 

First put on the installation Gloves (N) (To avoid fingerprints on the screen that cannot be erased) 
(Figure 1), move the completed frame from the Protection sheet (R) to a safe place, and wait for 
installation later

.

 

2. 

Take the Screen material (O) out of the packaging tube and set it gently on the Protection sheet 
(R). Gently press one end of the screen (screen edge) with a suitable weighted object or hand 
pressure (Cannot press and crush the screen material), face down, and two people hold the other 
end (rolled up end) clockwise slowly rotate the screen (Figure 2).  

3. 

Lay the material completely flat with the front facing down on a clean surface in a horizontal position 
(Figure 3). 

There are thumbtacks fixed on the paper tube at the end of screen expansion, please pay 

attention to the thumbtacks to avoid stabbing when removing! 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Backside of the screen

 

 

Frontside of the screen

 

Clean, flat and does not harm the screen

 

Heavy weighted object 
or hand pressure

 

Backside of the screen

 

(

Figure 1

(

Figure

2) 

(

Figure

3) 

Note: Screen back facing up  

(Face down) 

Summary of Contents for AR2 Series

Page 1: ...User manual AR2 fixed frame series Screw adjustment type Rev V210929DT Elite Screens China Corp...

Page 2: ...he screen s surface 3 Gently wipe the screen with a lightly moistened white lint free cloth with water or with a neutral detergent mixed with water Attention 1 Don t touch the screen material to avoid...

Page 3: ...lbow joints x 8 B Horizontal frame x 2 C Left Right vertical frame x 2 D Edge trim x 4 E Sliding nut x 4 F Wall bracket x 4 Installed in the frame already G M3x8 screw x 20 H M5x8 screw x 40 I M5x50 S...

Page 4: ...n at both ends of the Horizontal frame B as shown in the figure Reminder please place the frame in a relative position before assembling to avoid scratching the frame caused by collision during assemb...

Page 5: ...9DT Elite Screens China Corp 5 3 Make sure all four corners are properly in place to form a perfect square then fasten the four angles with the M5x8 flat head screws H Four corners join correctly to f...

Page 6: ...th a suitable weighted object or hand pressure Cannot press and crush the screen material face down and two people hold the other end rolled up end clockwise slowly rotate the screen Figure 2 3 Lay th...

Page 7: ...o long Adjustment bars Q 1 2 on the fiberglass rod of the short side of the screen material and two short Adjustment bars Q 3 4 5 6 on the fiberglass rod of the long side of the screen Installation di...

Page 8: ...y and gently place the assembled frame on top of the screen material In order to avoid puncturing the material do not allow the angled edge of the frame to come in direct contact with the screen 7 Ens...

Page 9: ...s two people should insert the M4x40 screw J through the frame hole and screw it on the adjustment bar Q for two turns according to the sequence of 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 1...

Page 10: ...n the screen surface it can be restored to flat surface by adjusting the tightness of the screws Two persons screw the screws on the adjustment bar 2 turns in sequence Screen material O M3 Hex Key K A...

Page 11: ...and the side affixed with product label on the back of the screen is the bottom frame 2 Place all the trim pieces along the edge of screen material Adjust the trim so that the top and bottom trim pie...

Page 12: ...has been installed screw off A screw on edge trim about 2mm gap then place a corner cover Q on all four corners final screw up the A screw Buckle two Edge trim D on the frame and overlap in the frame...

Page 13: ...r installation Because the screen material of this product is ambient light rejecting material only suitable for ultra short throw projector installation schematic diagram is as follows Note Each proj...

Page 14: ...or and place the view area to confirm the position of the screen according to the picture of the projector use a level to confirm whether the scree is level and then draw benchmark marking lines along...

Page 15: ...cated 1 Drill holes at four points A B C and D 2 And install anchors at four point hole 3 Fasten the screw on the anchors and keep the screw 1cm away from the wall 4 Two people lift the screen first c...

Reviews: