User manual
AR2
(Screw adjustment type)
Rev. V210929DT
Elite Screens China Corp.
6
Screen Material Installation
1.
First put on the installation Gloves (N) (To avoid fingerprints on the screen that cannot be erased)
(Figure 1), move the completed frame from the Protection sheet (R) to a safe place, and wait for
installation later
.
2.
Take the Screen material (O) out of the packaging tube and set it gently on the Protection sheet
(R). Gently press one end of the screen (screen edge) with a suitable weighted object or hand
pressure (Cannot press and crush the screen material), face down, and two people hold the other
end (rolled up end) clockwise slowly rotate the screen (Figure 2).
3.
Lay the material completely flat with the front facing down on a clean surface in a horizontal position
(Figure 3).
There are thumbtacks fixed on the paper tube at the end of screen expansion, please pay
attention to the thumbtacks to avoid stabbing when removing!
Backside of the screen
Frontside of the screen
Clean, flat and does not harm the screen
Heavy weighted object
or hand pressure
Backside of the screen
(
Figure 1
)
(
Figure
2)
(
Figure
3)
Note: Screen back facing up
(Face down)