The frame assemblies and final unit shape are now complete, but there are three further steps to
take:
1.
Securing to the wall and base
2.
Fitting the door
3.
Glazing the completed structure
Securing to the wall and base
1.
Offer the structure to the wall that it is to abut, ensuring that the verticals are plumb, and that
the building is square and at 90º to the wall, with a nail or pen, mark the wall through the
holes in the wall bar an ridge. Then remove the structure to another location and drill through
into the wall at the pre-marked locations with a masonry drill. Insert the plastic plugs into the
holes.
2.
The coil of paper-back resin impregnated foam can now be stuck onto the wall side of the
ridge and wall bars. (
Key point
).
3.
Offer the structure to the wall again and screw through the holes into the pre-located plastic
plugs in the wall, with the screws provided. If your wall is not plumb, it may require packing
between the alloy frame and the wall. Tighten up the screw until it is fully home.
Do the same at each screw location utilising any packing where necessary.
4.
Having successfully anchored the structure to the wall you can now secure it to its base.
Summary of Contents for 2'3'' Wide Easy Grow
Page 1: ......
Page 2: ......
Page 3: ......
Page 16: ...SINGLE DOOR FRAME ASSEMBLY ...
Page 29: ......
Page 32: ...ELITE 15 10 ...