6
List of Materials
Removing the packaging�
I
CAUTION
Remove carton carefully, Wear gloves to protect against sharp
edges�
I
WARNING
Remove the protective film covering the product before
putting into operation�
Supplied Part
Pieces
Supplied Part
Pieces
Hood assembly and LED lamps already installed
1
Mounting brackets
2
Metal spacers (for use when cabinet depth is greater than 12”)
2
4.5x13 mm
8
3.5x9.5 mm
6
4.2x15 mm
2
Torx #10 adapter
1
3.5x9.5 mm
4
Ø 6.4x18 mm washers
8
4.2x19 mm
8
Ø 6.4x18 mm washers
8
Parts not supplied
Tools/Materials required
• Level
• Drill with 1¼” (3,2 cm),
1
⁄
8
” (3,2 mm), y
1
⁄
16
” (4,8 mm) drill bits
• Pencil
• Pliers
• Tape measure or ruler
• Caulking gun and weatherproof caulking compound
• Saber or keyhole saw
• Metal snips
• Vent clamps
• Screwdrivers:
• Flat-blade
• Phillips
Parts needed
• 6” (15�2 cm) round metal vent system
KIT
# Part
Recirculating Kit
KIT02770
Grease filter
GF08PA
Hood Liner
KIT02773
KIT02774