During operation
- 69 -
The periodic
test should be carried out every 24 h. If more than 24 h since last
LIMAX Safe SG/SC informs control that it wants to have a contact test. Control is informed by LIMAX Safe
SG/SC also about if the prerequisites for the contact test are fulfilled or not.
If control is remembered by LIMAX Safe SG/SC that a contact test should be done, control will stop the car at a
floor and keep doors closed. So door circuit should normally be detected as closed by LIMAX Safe SG/SC. Con-
trol now sends LIMAX Safe SG/SC a demand to carry out the
test. After
test is finished, control may feel
free again to open the doors.
If control decides that it is a good moment to do the contact test and the prerequisites are fulfilled, control may
do the contact test to any time, also before 24 h are elapsed.
test will be controlled by the CANopen object 2129h
Test and relay test may be carried out at the same time. In this case it may be advanta-
geous to control relay test and contact test by PDO (relay test object and contact test object mapped on the
same PDO). For hints for suggested PDO-mapping
11.10.3
Implicit OC test
It is supervised:
Whenever
is open, door input must always be detected as open.
is kept open – by error level 2 – until manual RESET.
opens additional in order to avoid lift movement
is bridged => lift cannot be stopped with
will close again in recall state.
More information due to recall state see below.
After the bride is removed the error can be reset.
Inspection is treated in a different way:
If a bridged
is detected in inspection no error is set.
Otherwise a man on the roof would be locked in the shaft head when he over-travelled the inspection
limit switch with a bridge on the
If a bridged
is detected in inspection and inspection is left,
travel outside inspection is possible. If it is switched back to inspection a travel will be possible again.
This situation is reset by the RESET-button or by power cycle. The situation “bridge detected in inspec-
tion” is indicated by CANopen in object 2129h (
In Inspection the situation “
bridged” is secured by other means:
cerning inspection safety functions.
After a safety function tripped a recall travel will follow in many cases. This applies especially to “final limit
switches”. This is a normal situation and not error should be set.
Therefore control can set LIMAX Safe SG/SC in a “recall state” by CANopen:
In recall state the implicit supervision is disabled. Instead of this a recall-supervision is activated:
The speed is limited to 0.63 m/s
In case speed exceeds 0.63 m/s
will close again if standstill is reached and hold 10 s or if
recall state is left.
If LIMAX Safe SG/SC detects that lift is inspection, it will refuse a demand to go to recall state.
LIMAX Safe SG/SC must receive the demand to go to recall before the recall travel starts. Otherwise an error
will be set. Normally the technician will first turn the recall switch and then – may be 1 s or 2 s after – he would
initiate the recall travel by pushing a direction button. In this case control has enough time to detect the recall
state and send the demand to LIMAX Safe SG/SC.