background image

Page 8

Rev. 071520

1-888-651-3431

7. The following steps are from carrier to the trolley. Loosen the bent pin, clamp the hand wheel, 

rotate bending pin to 90 degrees as loosen state, pull the square of the fixed the square pin (2 Pcs), 

turn up the right carrier frame, the U-tube handle stretched out automatically from the left carrier 

frame, and adjust the U-tube handle after spinning in place, insert and fix the square pin (2 Pcs), pull 

out the long bent pin, then move out the carrier frame until see the square tube in the middle of the 

frame. Connect two solid rollers (2 Pcs) with long bar bent pins, fix with M3.8 Split pin on the other 

end, and move the frame again until the wheel hits the ground. See FIG 7.

8. Below are the carrier and trolley setups. See FIG 8.

Summary of Contents for CARGO-CART

Page 1: ... the Cargo Cart Distractions can cause you to lose control so visitors should remain at a safe distance from the work area Be aware of all power lines electrical circuits water pipes and other mechanical hazards in your work area particularly those hazards below the work surface hidden from the operator s view that may be unintentionally contacted and may cause personal harm or property damage Be ...

Page 2: ...This limited warranty does not cover products purchased through non authorized dealers Non authorized dealer receipts are not accepted for warranty verification Warranty claims must be made directly to the original place of purchase WARRANTY PERIOD This warranty remains in force for one year from the date of the product s accepted delivery The Authorized Dealer offers a one year manufacturer s war...

Page 3: ...Page 3 Rev 071520 1 888 651 3431 Tools Needed Adjustable Wrench 13mm Wrench Diagram and Parts List ...

Page 4: ... 1 Install the left carrier frame 1 along the arrow direction Fit the rotary shaft and axle sleeve togeth er with the right carrier frame 2 See FIG 1 2 Insert the U tube handle 3 into the left carrier frame along the arrow direction See FIG 2 ...

Page 5: ... tube using M8 35 outer hexagon bolts 5 4Pcs and M8 lock nut 6 4Pcs Fix the other end of the connecting swivel tube in the same way with right carrier frame 2 See FIG 3 4 After the left and right carrier frames are laid flat the hole position on the U tube handle is aligned with the hole position on the left carrier frame which is secured with square pin 7 2Pcs See FIG 4 ...

Page 6: ...sembly 8 Align the hole on the center Insert the bent pin 9 2Pcs down into the axle sleeve through M6 washer 10 2Pcs in sequence Compress the bottom of the carrier frame as shown screw the hand wheel 11 2Pcs See FIG 5 Note Rotate the bending pin to 90 degrees and switch between locking and loosening states ...

Page 7: ...rough the long bend pin 12 to solid roller 14 2Pcs and protective sleeve 13 2Pcs as shown and insert it into any hole of the bottom carrier frame Insert and fix M3 8 split pin 15 on the other end after passing through the square pipe See FIG 6 ...

Page 8: ...le stretched out automatically from the left carrier frame and adjust the U tube handle after spinning in place insert and fix the square pin 2 Pcs pull out the long bent pin then move out the carrier frame until see the square tube in the middle of the frame Connect two solid rollers 2 Pcs with long bar bent pins fix with M3 8 Split pin on the other end and move the frame again until the wheel hi...

Reviews: