17
Sensor and heating cable mounted
on the pipeline
Final Check
After the heating cable has been installed in the
gutter or in case of pipe installation, after thermal
insulation has been laid, perform the
measurements of the heating cable insulation's
resistance, and test-run the heating circuits to
assess the correctness and safety of the system's
operation.
The heating cable insulation's resistance, as
measured with an appliance of the rated voltage
1000 V (megaohmmeter), should not drop below
50 M . Enter the results into the Warranty Card.
Ù
Summary of Contents for SelfTec DW
Page 2: ......
Page 24: ......
Page 46: ......
Page 47: ...ELEKTRA SelfTec DW DW F 47 RU...
Page 48: ...6 5 4 3 2 1 7 1 2 3 4 5 6 7 LDPE ELEKTRA SelfTec DW 48 SelfTec DW DWF ELEKTRA...
Page 49: ...6 5 4 3 2 1 1 2 3 4 5 6 ELEKTRA SelfTec DW F 10 16 10 49...
Page 55: ...55 2 HL T 1 2 H LT 1 2...
Page 56: ...56 HL T HL T SelfTec DW DWF ELEKTRA...
Page 57: ...57 HL T ELEKTRA SelfTec DW DW F 30...
Page 58: ...58 SelfTec DW DWF ELEKTRA...
Page 59: ...59 ELEKTRA UTR60 PRO 16 1200...
Page 60: ...60 SelfTec DW DWF ELEKTRA 40 120 DIN 16 1200 ELEKTRA ETV 1991...
Page 61: ...61 5 1000 0 M...
Page 62: ...62 SelfTec DW DWF ELEKTRA PE...
Page 63: ...63 ELEKTRA ELEKTRA SelfTec DW 2 DW F c 1 a b 2 ELEKTRA 3 a b c d 4 ELEKTRA...
Page 64: ...64 SelfTec DW DWF ELEKTRA ELEKTRA...
Page 65: ...E mail P o 2...
Page 66: ...M M M C 1000 50 W...