8
SelfTec 16
®
ELEKTRA
Heated pipeline systems, sprinkler systems,
etc., must be insulated.
The thickness of thermal insulation layer
must be minimum 10 mm for pipes up
to 1 in. diameter, and at least 15 mm
for pipes up to 2 in. diameter.
Note:
Gutters, downpipes
Selection of the adequate length of the heating
cables depends from:
installation site.
• min. ambient temperature in the area
of the
Number of segments
of the heating cable
Below -5°C
gutters
downpipes
Above -5°C
Min. ambient
temperature
[°C]
1
1
2
1 or 2*
* if the building is located in the regions
of intense snowfall
The values are given for gutters of diameters
Ø100-125 mm.
Summary of Contents for SelfTec 16
Page 2: ......
Page 24: ......
Page 45: ...RU Instrukcja monta u PL Installation manual UK SelfTec 16 ELEKTRA www elektra otoplenie ru...
Page 46: ......
Page 47: ...ELEKTRA SelfTec 16 ELEKTRA SelfTec 16 47 RU...
Page 50: ...50 SelfTec 16 ELEKTRA ELEKTRA SelfTec 16...
Page 52: ...10 1 15 2 52 SelfTec 16 ELEKTRA 5 C 5 C C 1 1 2 1 2 100 125...
Page 53: ...53...
Page 55: ...SelfTec 16 ELEKTRA 30 55...
Page 56: ...56 SelfTec 16 ELEKTRA...
Page 57: ...57 GH 2 30...
Page 58: ...58 SelfTec 16 ELEKTRA GH 2 DSW 2 DSC 2 6 40 6...
Page 59: ...59 1 DSW SB 1 FCS 1 SS 1 2 2...
Page 60: ...ELEKTRA UTR60 PRO 16 1200 60 SelfTec 16 ELEKTRA...
Page 61: ...40 C o 120 C DIN 16 1200 ELEKTRA ETV 1991 61...
Page 62: ...62 SelfTec 16 ELEKTRA ELEKTRA ETR2 DIN 16A 1200...
Page 63: ...19 63 1000 50 M...
Page 64: ...ELEKTRA ELEKTRA SelfTec 3 c 16 1 a b 2 ELEKTRA 3 a b c d e 4 ELEKTRA 62 SelfTec 16 ELEKTRA...
Page 65: ...E mail P o 3...
Page 66: ...M M M C 1000 50 W...