
5
Installation must be executed in a clean
and dry place. Protect the termination
points of the heating cable, as well as all
the components of the installation kit,
against moisture, both before and during
installation, and maintain in the dry state.
Detailed agreement with the instructions
and maintaining the recommended
sequence of the installation procedure
must be observed.
Note:
4
3
2
1
1
2
3
Kit contents:
M25 gland and gasket with oval opening
double insulation silicone tubes,
150mm long
auxiliary insulation tubes covering silicone tubes,
180mm long
green-yellow tube, 160mm long
4
Summary of Contents for CACM25-PROi
Page 2: ...CACM25 PROi 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ...
Page 16: ...16 CACM25 PROi 12mm 12mm A14 a b ...
Page 18: ...18 A16 CACM25 PROi ...
Page 20: ...0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CACM25 PROi ...
Page 27: ...27 A3 Zdjąć powłokę A4 Przez otwór w ekranie ochronnym wysunąć element grzejny ...
Page 28: ...28 Skręcić ekran 140mm Naciąć i zdjąć izolację na długości 140mm A5 A6 CACM25 PROi ...
Page 34: ...34 CACM25 PROi 12mm 12mm A14 a b ...
Page 36: ...36 A16 CACM25 PROi ...
Page 38: ...0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CACM25 PROi ...
Page 52: ...52 CACM25 PROi 12 ìì 12 ìì A14 a b 10 ìì 10 ìì ...
Page 54: ...54 A16 CACM25 PROi ...
Page 56: ...0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CACM25 PROi ...
Page 63: ...63 A3 Den Mantel abnehmen A4 Durch die Öffnung im Schutzschirm das Heizelement hinausschieben ...
Page 70: ...70 CACM25 PROi 12mm 12mm A14 a b ...
Page 72: ...72 A16 CACM25 PROi ...
Page 73: ......
Page 74: ...www elektra eu ESG DE 420 Grupa V5 05 19 0 1 f ...