
The design of electrical heating systems
must be executed according to the design
directives for explosive conditions, basing
on the manufacturer’s recommendations
and supervised by qualified experts.
Heating systems must be executed in full
accordance with the instructions herein,
and the installation must be performed
by an authorised electrician.
Before undertaking any maintenance
works/repairs/ alterations, read the
specification of the heating system.
The specification of the heating system
should be stored for any heating circuit,
as long as the system is in use.
Note:
4
CACM25-PROi
Electrical systems must be checked
before the first start-up.
Anti-frost systems must be checked
before each heating season.
Regularly check systems for maintaining
process temperature, min. twice a year.
Note:
Summary of Contents for CACM25-PROi
Page 2: ...CACM25 PROi 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ...
Page 16: ...16 CACM25 PROi 12mm 12mm A14 a b ...
Page 18: ...18 A16 CACM25 PROi ...
Page 20: ...0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CACM25 PROi ...
Page 27: ...27 A3 Zdjąć powłokę A4 Przez otwór w ekranie ochronnym wysunąć element grzejny ...
Page 28: ...28 Skręcić ekran 140mm Naciąć i zdjąć izolację na długości 140mm A5 A6 CACM25 PROi ...
Page 34: ...34 CACM25 PROi 12mm 12mm A14 a b ...
Page 36: ...36 A16 CACM25 PROi ...
Page 38: ...0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CACM25 PROi ...
Page 52: ...52 CACM25 PROi 12 ìì 12 ìì A14 a b 10 ìì 10 ìì ...
Page 54: ...54 A16 CACM25 PROi ...
Page 56: ...0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CACM25 PROi ...
Page 63: ...63 A3 Den Mantel abnehmen A4 Durch die Öffnung im Schutzschirm das Heizelement hinausschieben ...
Page 70: ...70 CACM25 PROi 12mm 12mm A14 a b ...
Page 72: ...72 A16 CACM25 PROi ...
Page 73: ......
Page 74: ...www elektra eu ESG DE 420 Grupa V5 05 19 0 1 f ...