59
Fig. 17
Fig. 16
FO 2159
Securing the oven to the cabinet
- Fit the appliance into the cabinet recess.
- Open teh oven door and secure the oven to the kitchen
cabinet with four wood screws, which fit the holes
provided in the oven frame (Fig.16).
When installing an electric plate hob over the oven, the
hob's electrical connection and the oven's one have to be
carried out separately, for security reasons and to let the
oven be taken off the unit easier, if necessary.
Electrical connection
Before the appliance is connected:
1) check that the main fuse and the domestic installation
can support the load;
2) check that the power supply is properly earthed in
compliance with the current rules;
3) check the socket or the double pole switch used for
the electrical connection can be easily reached with
the appliance built in the forniture unit.
This appliance is supplied without connection cable. A
suitable one must be fitted, in compliance with the
electric supply rate. Only the following cable types must
be used: H07 RN-F, H05 RN-F, H05 RR-F, H05 VV-F, H05
V2V2-F (T90), H05 BB-F (section 3x 1,5 mm
2
). A suitable
plug, able to carry the load specified on the rating plate,
must be fitted to the cable. The plug has to be fitted in
a proper socket.
If connecting the appliance directly to the electric system,
a double pole switch must be installed between the
appliance and the electricity supply, with a minimum gap
of 3 mm. between the switch contacts and of a type
suitable for the required load in compliance with the
current rules. The earth wire must not be interrupted by
the double switch pole.
The connection cable has to be placed in order that, in
each part, it cannot reach a temperature 50 °C higher than
the room temperature.
After the connection is carried out, test the heating
elements for about 3 minutes.
Terminal block
The oven has an easily accessible terminal block, which
is meant to work with an electric single-phase rate of
230 V (Fig. 17).
The manufacturer disclaims any
responsability should all the safety
measures not be carried out.
FO 0039