05306004
Page
Notice
Date
INSTALLATION
MANUAL
3
6
1004
D0884
6. Installation/
Putting into service
Gas connection
CAUTION
The installation, connection and gas arrival adjustments for the
machine must be done by qualified personnel only.
The customer must install a filter and a manual stop valve on the supply side of the
machine if NATURAL GAS is used.
For BUTANE 28-30 mbar or PROPANE 37 or 50 mbar, the customer must install a
filter, a manual closing valve and a pressure reducer.
Check that the diameter of injectors is adequate for the king of gas of your installation (see
table). The machine is delivered with extra injectors in a plastic envelope. There is also a
sheet metal plate with a cork joint or an adjusting head to feed the machine with another gas.
Connect the installation at the exchanger DN 20 (3⁄4" BSP).
Gas burner
Injectors
Gas admission
Summary of Contents for FC48
Page 1: ...05306004 GB 26 2019 Installation manual Finishing cabinet FC48 Translated from french ...
Page 2: ......
Page 34: ... ...
Page 35: ... ...
Page 36: ...Share more of our thinking at www electroluxprofessional com ...