Electroair Acquisition Corp.
IM EA-15000
Page 8 of 10
Revision 01
Prepared by: EAC
02/04/2020
Figure 4: Configuration B Cutout Dimensions
CAUTION: Before cutting or drilling verify space is clear behind the
instrument panel.
CAUTION: Use extreme care as to not damage any wiring,
instruments, structural, and fuel lines.
CAUTION: The connectors and connecting hardware for the starter switch are
small. Take extreme care not to lose them.
CAUTION: Ensure electrical connectors are tight on switch connections. Ensure
wires will not pull out of any electrical connections.
Left Mag Switch
o
Connect ground to GND.
o
Connect the P-Lead from the Left Magneto to P-LEAD.
Right Mag Switch
o
Connect ground to GND.
o
Connect the P-Lead from the Right Magneto to P-LEAD.
Starter Switch
o
Use this switch as the Start Switch.
o
Connect lead from starter terminal of ignition switch to terminal 1.
o
Connect B+ to terminal 2.
Insulate any exposed electrical connections in accordance with 43.13-1B Change
1 section 11-159.
Insert ignition/starter switch panel into instrument panel and screw down using
standard hardware.