background image

 

Electroair Acquisition Corp. 

IM EA-15000 

Page 8 of 10 

Revision 01 

Prepared by:  EAC 

02/04/2020 

 

Figure 4: Configuration B Cutout Dimensions 

 

  CAUTION:  Before cutting or drilling verify space is clear behind the 

instrument panel. 

  CAUTION:  Use extreme care as to not damage any wiring, 

instruments, structural, and fuel lines. 

  CAUTION:  The connectors and connecting hardware for the starter switch are 

small.  Take extreme care not to lose them. 

  CAUTION:  Ensure electrical connectors are tight on switch connections.  Ensure 

wires will not pull out of any electrical connections. 
 

  Left Mag Switch 

o

  Connect ground to GND. 

o

  Connect the P-Lead from the Left Magneto to P-LEAD. 

  Right Mag Switch 

o

  Connect ground to GND. 

o

  Connect the P-Lead from the Right Magneto to P-LEAD. 

  Starter Switch 

o

  Use this switch as the Start Switch. 

o

  Connect lead from starter terminal of ignition switch to terminal 1. 

o

  Connect B+ to terminal 2. 

  Insulate any exposed electrical connections in accordance with 43.13-1B Change 

1 section 11-159. 

  Insert ignition/starter switch panel into instrument panel and screw down using 

standard hardware. 

Summary of Contents for EA-15000

Page 1: ...evision 01 Prepared by EAC 02 04 2020 Electroair Acquisition Corp 5097 Williams Lake Road Waterford MI 48329 U S A Phone 248 674 3433 Fax 248 674 4231 Email sales electroair net EA 15000 Installation...

Page 2: ...STATEMENTS 5 INSTALLATION OF EA 15000 6 GLOSSARY AND ABBREVIATIONS 10 Table of Figures Figure 1 Configuration A Overall Dimensions 6 Figure 2 Configuration B Overall Dimensions 6 Figure 3 Configurati...

Page 3: ...nds reading through this entire installation procedure before installing the Electroair Ignition Starter Switch Panel to your aircraft Make sure that any questions are answered before the actual insta...

Page 4: ...TO OBTAIN THE STC AUTHORIZATION LETTER Receiving and Acceptance Checking of EA 15000 Kit 1 Inspect the packaging for damage before acceptance from the freight carrier If damaged refuse the package 2...

Page 5: ...and either a poor performing EIS or the possibility of damaging equipment Prior to turning on bus power verify the wiring Please call Electroair with any questions sales electroair net or 248 674 3433...

Page 6: ...ations Determine the proper location for the panel Determine the most appropriate mounting method Overall dimensions are provided in Figure 1 and Figure 2 Cutout dimensions are provided in Figure 3 an...

Page 7: ...ry key switch location plug the hole left by removing the rotary key switch as necessary 3 Set up Installation of p n EA 15000 Ignition Starter Switch Panel Review the leads corresponding to the locat...

Page 8: ...ectrical connectors are tight on switch connections Ensure wires will not pull out of any electrical connections Left Mag Switch o Connect ground to GND o Connect the P Lead from the Left Magneto to P...

Page 9: ...during starting Start the aircraft per the AFMS and perform a ground run up o Check for proper starter function o Check for proper RPM drop on Left Magneto o Check for proper RPM drop on Right Magneto...

Page 10: ...r Wheel EIS Electronic Ignition System FAA Federal Aviation Administration Ignition Timing is the process of setting the angle relative to piston position and crankshaft angular velocity that a spark...

Reviews: