Electroair Acquisition Corp.
IM EA-13000
Page 2 of 10
Revision 03
Prepared by: EAC
02/04/2020
Table of Contents
REVISION LOG .............................................................................................................. 2
OVERVIEW OF IGNITION/STARTER SWITCH PANEL INSTALLATION ..................... 3
EA-13000 KIT DESCRIPTION & REQUIREMENTS ....................................................... 4
EA-13000 KIT CONTENTS ............................................................................................. 4
RECEIVING AND ACCEPTANCE CHECKING OF EIS KIT .......................................... 4
PRECAUTIONARY STATEMENTS: ............................................................................... 5
INSTALLATION OF EA-13000: ...................................................................................... 6
GLOSSARY AND ABBREVIATIONS: .......................................................................... 10
Table of Figures
Figure 1: Configuration A Overall Dimensions ............................................................... 6
Figure 2: Configuration B Overall Dimensions………………………………………………6
Figure 3: Configuration A Cutout Dimensions ................................................................ 7
Figure 4: Configuration B Cutout Dimensions ................................................................ 8
Figure 5: Configuration A and B Back Surfaces……………...……………………………..9
Revision Log
Revision
Pages
Affected
Date of
Revision
Description of Revision
Approved
by
Date of FAA
Approval
00
05/12/2015
Initial Release
08/26/2015
01
05/12/2016
ECO 1019-0007
05/12/2016
02
06/20/2016
ECO 1019-0016
02/03/2017
03
1,2,4,5,7,
8,9
02/04/2020
ECO 1019-0079