background image

 

Attach the regulator (J) to the gas cylinder (not 
included). 
 
Place the gas cylinder into the rear of the unit and close 
the door (F). 
 

Note: See instruction Gas requirement and 
Connecting to a gas cylinder before buying a gas 
cylinder.

 

 

 

 

 

 

 

SECURING THE BASE

 

 
Secure 3pcs base brackets to the base using preassembled 6pcs bolts M5 x 12 (KK), 6pcs Φ5 washers (EE) and 6pcs 
lock washers (JJ) firstly, then strike suitable hook bolts or raw bolts through the stand holes into the ground. (See 
figure 1) 
 

 

 

 

 

 

 

 

 

Summary of Contents for EQODHMBL

Page 1: ...USER MANUAL GAS PATIO HEATER EQODHMSS EQODHMBL WARNING FOR OUTDOOR USE ONLY OR IN WELL VENTILATED AREAS PLEASE KEEP THE MANUAL FOR FUTURE REFERENCE...

Page 2: ...2 CONTENTS SAFETY 3 PARTS LIST 5 ASSEMBLY 6 SECURING THE BASE 9 OPERATION 10 LEAK TESTING 11 GAS INFORMATION 11 MAINTENANCE 12 STORAGE 12 TROUBLESHOOTING 13 SPECIFICATIONS 14 SUPPORT 14...

Page 3: ...ground Turn off the gas cylinder if gas leak is suspected Parts sealed by the manufacturer must not be altered by the user No modifications should be made to any part of this heater and repairs and m...

Page 4: ...items on this heater DO NOT operate this heater unless it is fully assembled with its reflector in place Respect the minimum clearances from combustible materials GENERAL INFORMATION FOR SUCCESSFUL A...

Page 5: ...r of Housing Preassembled 1 I Gas Pipe 1 J Hose Regulator 1 K Post 1 L Base Preassembled 1 M Wheel Kit 1 PART DESCRIPTION IMAGE QTY PART DESCRIPTION IMAGE QTY AA M8 flange 2 GG Cap Nut 12 BB M8x16mm b...

Page 6: ...wheel assembly M with the corresponding holes on base L Then insert M8 x 16 mm bolts BB through the holes Hand tighten with the M8 flange nuts AA Be sure the wheel assembly M is parallel to the base L...

Page 7: ...this point Attach the Reflector Panels A together using the M6 x 8mm Screws FF 6 Washers DD and Cap Nuts GG Do not fully tighten at this point Note In order to achieve proper alignment of reflector s...

Page 8: ...t the hose regulator assembly I J through top of housing E and Post K tighten gas pipe I to head assembly C Secure head assembly C to the post K using bolts M5 x 10 HH lock washer JJ and 5 washers EE...

Page 9: ...instruction Gas requirement and Connecting to a gas cylinder before buying a gas cylinder SECURING THE BASE Secure 3pcs base brackets to the base using preassembled 6pcs bolts M5 x 12 KK 6pcs 5 washe...

Page 10: ...E PATIO HEATER Before lighting the patio heater the pilot light should be lit with the dial set to PILOT Press the dial and turn anti clockwise to the HIGH position When the mesh glows the dial can be...

Page 11: ...r with a damaged body valve collar or foot ring A dented or rusty gas cylinder may be hazardous and should be checked by a gas supplier Never connect this appliance to an unregulated gas source When t...

Page 12: ...may create a fire hazard If any carbon deposits develop clean the dome and burner with warm soapy water Note In environments with a high salt content such as near the sea corrosion occurs more quickly...

Page 13: ...operate heater below 5 40 F Gas pressure is low Replace the gas cylinder Tank is almost empty Replace the gas cylinder Supply hose is bent or kinked Straighten hose and perform leak test on the hose C...

Page 14: ...NO PT SE SI SK RO TR CZ FR GB GR IE PT PL AT CH DE AT CH DE NL Category I3 28 30 37 I3B P 30 I3P 37 I3B P 37 I3B P 50 I3P 50 Gas G30 G31 G30 G31 G31 G30 G31 G30 G31 G31 Pressure mbar 28 30 37 30 37 3...

Reviews: