9
8. Adjust the height of the chimney to
approximately
the required height.
Then install plate I on the chimney.
Two screws (4mm x 8mm) are used.
i Put the inner chimney into the outer
chimney. Then pull the inner chimney
upwards. Adjust to reach the
approximate height required. Fine
height adjustment is done later.
ii. Install plate I on the chimney
NOTE: Remember not to fix the screw too tightly, so that later height
adjustment can be done more easily.
9. Fix the chimney set into the chimney bracket
and fix with 2 x Screws (4mmx8mm), then fix
the outer chimney bracket into wall with 2 x
screws (4mm x 40mm), pull out the exhaust
pipe to outside.
10. Pull up the inner chimney and fix it into
inner chimney bracket with 2 x screws (4mm
x 8mm).