![ElectrIQ eiQ-12K12KC24KWMINV User And Installation Manual Download Page 9](http://html.mh-extra.com/html/electriq/eiq-12k12kc24kwminv/eiq-12k12kc24kwminv_user-and-installation-manual_2379333009.webp)
9
INSTALATION GUIDE
SAFETY
Only qualified personnel should install this appliance. This install manual is intended for use by
individuals possessing adequate backgrounds and qualifications in electrical, electronic,
refrigerant and mechanical field. Any attempt to install or repair the appliance may result in
personal injury and property damage. The manufacturer or seller cannot be responsible for the
interpretation of this information, nor can it assume any liability in connection with its use. The
units are designed for permanent installation. The equipment is designed for domestic or office
use and we are not making any endorsements for use in industrial or maritime environment. Do
not place near sources of heat, vapours, industrial machine oil or other
flammable gases. High
frequency waves generated by radio equipment, welders and medical equipment will interfere
with the normal operation of the unit. Install this device only when it complies with local/national
legislation, ordinances and standards. Check the mains voltage and frequency. This unit is only
suitable for earthed electrical supply, connection voltage 230 V~ / 50 Hz.
The information, specifications and parameter are subject to change due to technical
modifications or improvement without any prior notice. The accurate specifications are presented
on the nameplate label.
Please read this installation manual completely before installing the product.
When the power cord is damaged, replacement work shall be performed by authorized personnel
only.
Installation work must be performed in accordance with all European, national and / or local
directives and standards and must be done by authorized personnel only.
Always make sure to wear the correct personal safety protections such as protective eyewear,
gloves, ear protection etc.
This air conditioner contains a refrigerant and can be classified as pressurized equipment.
Therefore always contact an authorized air conditioning engineer for installation and maintenance
of the air conditioner. The air conditioner must be inspected and serviced on an annual base by
an authorized air conditioning engineer.
For your convenience you can download the latest version of the user / installation manual on
www.electriq.co.uk
Indoor Unit Position
The air inlet and outlet vent should be away from any obstruction, ensuring that there is a good
airflow through the whole air-conditioned space. Select a position where the condensing water can
be easily drained out, and the indoor unit can be easily connected to outdoor unit.
The wall where
the unit is fixed should be
strong enough to withstand the full weight and vibration of the unit. The
unit should be accessible for service maintenance. The height of the installed unit should be ideally
more than 200cm from floor. The air conditioner must not be installed in a wet environment such
as a bathroom, shower or swimming pool etc.
Outdoor Unit Position
A convenient position, dry and well ventilated, outside of direct sunlight or strong winds, which is
not on flood line and where noise and airflow does not cause interference or inconvenience.
Select a location where there should be no obstructions to the inlet and outlet vents. The location
should be able to withstand the full weight and vibration of the outdoor unit and permit safe
installation.
Make sure that the outdoor unit installation is made in respect to installation dimension diagram
with easy maintenance access. Select a place where it is out of reach of children. Do not block
utilities access or fire escapes.
The external unit must be lifted and put in place by two people or by specialised equipment.
Summary of Contents for eiQ-12K12KC24KWMINV
Page 13: ...13 ...
Page 20: ...20 Outdoor Unit ...