10-1
TUBING CONNECTIONS
SM WNGDCI 1-E.1 GB
10. TUBING
CONNECTIONS
6ALVE0ROTECTION#APEND
2EFRIGERANT6ALVE0ORTUSE!LLENWRENCHTOOPENCLOSE
6ALVE0ROTECTION#AP
2EFRIGERANT6ALVE
3ERVICE0ORT#AP
&LARE.UT
5NIT"ACK3IDE
#OPPER4UBE
7HENTHEOUTDOORUNITISINSTALLEDABOVETHEINDOORUNITANOILTRAPISREQUIREDEVERYMALONGTHESUCTIONLINE
ATTHELOWESTPOINTOFTHERISER)NCASETHEINDOORUNITISINSTALLEDABOVETHEOUTDOORNOTRAPISREQUIRED
¼’’
Ǫ
’’
Flare Nuts
11-13 40-45
Valve Cap
13-
2
0 13-
2
0
Service Port Cap
11-13 11-13
TORQUE (Nm)
TUBE (Inch)
CONTENTS