3.2 Pipe work
The H.R.UV-C SPA should be placed downstream (after) of any pumps, filters and heating devices but
upstream (before) of any chemical dosing or similar water treatment (see Figs.4 ).
Fig. 4
3.3 Flow direction
The
H.R.UV-C SPA
is factory set to accept input water flow entering on the left and exiting on the right,