background image

All disclosures, notices and warranty conditions are being written on the EKWB website. Please read terms of use.                                               Released on 26st of October, 2012.  
 

 

Installation and mounting manual for EK-D5 Dual TOP CSQ 

This product is intended for installation only by expert users. Please consult with a qualified technician for installation. Improper installation may result in damage to your equipment. EK Water Blocks assumes no liability 
whatsoever, expressed or implied, for the use of these products, nor their installation. The following instructions  are subject to change without notice. Please visit our web site at 

www.ekwb.com

 for updates. Before 

installation of this product please read important notice, disclosure and warranty conditions printed on the back of the box. 
 

Before you start using this product please follow these basic guidelines: 

1.

 

Please carefully read the manual before through before beginning with the installation process! 

2.

 

Please remove your motherboard from the computer to assure safest mounting process in order to prevent any possible damages to your CPU and/or motherboard’s circuit board (PCB).

 

3.

 

The EK High Flow and EK-PSC type fittings require only a small amount of force to screw them firmly in place since the liquid seal is ensured by the rubber o-ring gaskets.

 

4.

 

The use of corrosion inhibiting coolants is always recommended for any liquid cooling system.

 

5.

 

EKWB recommends 24 hour leak testing for all EK products before powering on the computer. This will eliminate any damages that may occur because of the users improper installation or 

products imperfections.

 

STEP 1:  GENERAL INFORMATION.

 Sample picture of EK-D5 Dual TOP CSQ mounted with two Laing D5 pumps (MCP 655) – (Left picture)

 

 

 

 

Picture of enclosed parts in delivery.  

 

 

STEP 2 and 3:  PREPARING THE PUMP AND ASSEMBLING THE “EK-D5 Dual TOP CSQ” WITH TWO PUMPS 
 

 

 

 

 

 

 

 

2. PREPARING THE PUMP.

 

Take your Laing D5 or MCP655 branded pump. 
Unscrew the Screw ring and take only motor 
with impeller. (the rest parts of the pump 
delivery you will not need.) 

3. ASSEMBLING THE “EK-D5 Dual TOP 
CSQ” WITH TWO PUMPS

 

Take motor with impeller of your Laing D5 or 
MCP655 branded pump. Place it according to 
right picture. Do not forget to place o-rings 
that are enclosed in “EK-D5 Dual TOP CSQ” 
box. Use enclosed 2,5mm Allen key to screw 
the 16 M4×16mm screws on bottom side to 
secure the pumps. 

Place the o-ring here 

Use 14 pcs of M4×16mm screws 
to mount the pumps to the top. 
Use enclosed 2,5mm Alen key. 

2 INLET 

2 OUTLET 

Two outlets have 
to be closed with 
enclosed 

G1/4 

plugs. 

CAUTION!

 

Top  part  of  the  EK-D5  Dual  TOP 
CSQ  is  not  symmetrical  therefore 
please  pay  attention  to  the 
orientation! 

1 INLET 

1 OUTLET 

Mounting mechanism 

Orings 

D5 Ring 

Mounting bracket 

Preassembled 
subparts/tops 

Reviews: