ektor 03135 EV-MERCURY Installation Instructions Manual Download Page 20

Ph: + 612 9502 1161
Fax: + 612 9502 1154
Email: 

[email protected]

evolt.com.au

Reference: 605673 V2.4

Summary of Contents for 03135 EV-MERCURY

Page 1: ... 19 Self test commissioning interval programming 20 Product specifications 21 Spacing table 22 Australian emergency classification 23 Construction sites 24 Testing precautions 25 Warranty information 26 Problem solving procedure 27 Compliance standards 28 Technical support and troubleshooting MANUFACTURED TO ISO9001 1 WELCOME Thank you for choosing this quality Ektor product This manual is intende...

Page 2: ...attery Smart battery conditioning to ensure the best performance from the battery 450V Electrolytic capacitors which increase the products reliability Highly efficient design to reduce fatigue on the product For buildings requiring longer durations such as 3 or 4 hours the installer can change the jumpers found on the unit for automatic scaling of the output Moreover should you require non maintai...

Page 3: ...place of purchase for replacement If the product is satisfactory proceed with the installation 2 Remove the cover using a flat blade screwdriver to release the clip by pushing in and down as shown below The Mercury top cover can then be removed by sliding it away from the screwdriver The cover MUST BE mounted prior to attaching to the Mercury body 3 The product can be a suspended or surface mount ...

Page 4: ...w for the rod mount to be assembled to the products top cover 2 Ensure rod is mounted ONLY on a flat surface and fasten with the appropriate fixing i e masonry anchor for concrete 3 A 25 tube is to be used pushed firmly on both ends and fastened with M5 cap screws and locknuts Figure 2 Mercury rod mount installation NOTE DO NOT over tighten screws when mounting the rod mount to the Mercury The rod...

Page 5: ...Mercury as shown in the disassembly instructions in section 4 page 3 of this manual This will allow for access to mounting holes in the products top cover 2 The top lid of the Mercury is to be mounted first by fastening screws into position The screw positioning can be seen in figure 3 A 3 Once the lid has been securely mounted the Mercury may be assembled by sliding the Mercury body into place B ...

Page 6: ... be threaded with the chain first before assembly of the Mercury 3 Using pliers clamp the jack chain and thread through the Mercury as shown in figure 4 A Figure 4 Jack chain installation NOTE Once the cover has been chain mounted the Mercury can be assembled Ensure the cable is secured onto the jack chain and that there is no strain or tension on the cabling as shown in figure 4 Cable Jack chain ...

Page 7: ... the mounting holes in the products top cover 2 The top lid of the Mercury is to be wall mounted first by fastening screws into position The screw positioning can be seen in the figure 5 A 3 Once the lid has been securely mounted the Mercury may be assembled by sliding the Mercury body into place B Figure 5 Mercury wall mount installation NOTE Ensure screws are fastened into position B A ...

Page 8: ... BLOCK WIRING Wiring schematic for the terminal block used with the Mercury is illustrated below Figure 6 Wiring schematic Figure 7 Schematic descriptions L N L DA2 DA1 CONNECTION DESCRIPTION L N L DA2 DA1 Unswitched Active Neutral Switched Active DALI DALI ...

Page 9: ...wn in section 4 page 3 of this manual Also remove the top section of the product by sliding across to the right and pulling the part upwards as shown in the figure below 3 Disconnect the battery from the product and if necessary cut cable ties to release the battery from its mounting position 4 Replace the battery as was previously installed and secure with cable ties 5 Replace the Mercury back in...

Page 10: ... POWER AND BATTERY CHARGE The Ektor Generation III platform uses smart battery charging technology which reduces power consumption and increases battery life During the first stage of operation the battery charger charges the battery until full Afterwards the unit goes into a stage which charges the battery periodically This reduces the battery temperature and reduces the loss of electrolytes whic...

Page 11: ...ughterboard 06118 optional Mercury inverter 01210 01211 1 2 12 SELF TEST STANDARD WIRING CENTRAL BATTERY SYSTEM The inverter can be used in an automatic self test mode which reduces the need for a test switch timer The self test ability automatically disables if the unit is wired to DALI or the wireless daughterboard is attached Additionally the third generation platform can be wired to a central ...

Page 12: ...ction 16 The inverter also supports central battery systems and can be monitored through DALI When used as a central battery system the devices can be tested with DALI Figure 12 Inverter DALI wiring diagram 14 USING THE INVERTER WITH A SWITCH A mains rated switch can be wired with this product to turn ON OFF the light in normal use This does not affect operation in emergency mode Figure 13 Inverte...

Page 13: ...Y ADAP STAN EV MERCURY ADAP LEGR EV MERCURY ADAP COOP ZC WIFI ZC ECM DALI 01210 01211 01300 01995 01996 03137 03922 03924 03925 03926 03927 06118 05304 16 NON MAINTAINED MAINTAINED JUMPER 17 DISCHARGE RATING SELECTION A user can select the mode of operation for the Mercury inverter If the inverter is using a switch input this is disregarded and not used The Mercury supports a number of discharge r...

Page 14: ... also be enabled using the test button sequence below INDICATOR DESCRIPTION YELLOW 2sec ON 2sec OFF YELLOW 4sec ON 1sec OFF YELLOW 0 5sec ON 0 5sec OFF GREEN 1xFlash Device is performing a duration test Last duration test passed The duration was met when last run Test ran less than five days ago Last duration test failed Failed to meet duration The device is not currently running a new test Mains ...

Page 15: ...mergency classification Maintained power consumption Non maintained power consumption Viewing distance Mounting type Wiring Battery voltage Charging time Charger operation Charger type Average 3W 0 25W 24M Rod surface jack chain wall mount Terminal block 6 4V 16 hours Multi state Smart charge 220 240V 50Hz 0 40 C LiFePO4 6 4V 2 Depending on jumper IP20 Mercury IP65 Case C0 E2 C90 E1 6 2hr Max 4 5W...

Page 16: ...ou will need to allow 24 hours to charge its battery Once the battery is fully charged you will need to conduct a manual discharge test as per the requirements of AS NZS 2293 or other relevant standards At the time of printing the Australian standard requires that new fittings operate in emergency mode for at least 2 hours for their first discharge test Further tests are to be carried out at inter...

Page 17: ...t with any warranty claim Evolt recommends that the purchaser attaches their proof of purchase to their product manual If you wish to claim under this Warranty you must at your own expense return the product or that part of the product which you believe is defective and proof of original purchase your name address and telephone number and a certificate of installation or other document required by...

Page 18: ...ns equipment input current 16 A per phase IEC 61000 3 2 Ed 3 0 2005 MOD European Committee for Standardisation EN 60598 1 2008 A11 2009 EN 60598 2 22 1998 A1 2003 A2 2008 EN 55015 2006 A1 2007 A2 2009 EN 61547 2009 EN 61000 3 2 2006 A1 2009 A2 2009 EN 61000 3 3 2008 Luminaires Part 1 General requirements and tests Luminaires Part 2 22 Particular requirements Luminaires for emergency lighting Limit...

Page 19: ...MERCURY EMERGENCY INSTALLATION INSTRUCTIONS 19 ...

Page 20: ...Ph 612 9502 1161 Fax 612 9502 1154 Email sales evolt com au evolt com au Reference 605673 V2 4 ...

Reviews: