background image

1.INFORMATION ABOUT THE INSTRUCTION  

 

This manual includes a descriptive section as well as a section with drawings showing the main stages of assembly. The section 

with drawings is in the part with directions for assembly. These instructions should be treated as original according to the records 

of the European Directive 2006/42 / EC. These instructions contain important information about the product. Please read them 

carefully and follow them.

2.INFORMATION BEFORE THE ASSEMBLY  

 

Before installing the EVB package, its condition and correctness should be checked. Pay particular attention to the condition 

of the straps and ladders (if any). The packed box and rails should be stored in a dry place until assembly. It is forbidden to 

stack boxes, rest objects on boxes or place items on boxes. Prior to installation, the condition of the building’s EVB should be 

assessed. If necessary, additionally attach the box or guides directly to the building or EVB. Additional reinforcements of the 

RAFF-i box must be attached to the lintel of the building. The EVB package may only be installed in the RAFF-i box when it is in 

a technically perfect condition. No additional structural elements or non-system fixings may be mounted on the box. They can 

adversely affect the function of the EVB and lead to damage to it. The end positions of the EVB package are preset. In case 

of de-programming, they must be set again in accordance with the manual of the motor used in the EVB  package.

Electrical installations must be performed by authorized electricians in accordance with the requirements of the country where 

the installation takes place. When working at greater heights, installers and construction elements must be secured against 

falling. Some components of the RAFF-i system can be cut from sharp edges!

ASSEMBLY INSTRUCTION

OF THE RAFF-I EXTERNAL VENETIAN BLINDS

3.INSTALLATION OF THE EXTERNAL VENETIAN BLINDS  

In order for the EVB to meet its technical properties, the correct production process and correct assembly are 

important

EXAMPLES OF CONSTRUCTION VARIANTS

On the reveal in the version of a 

visible box..

On the reveal in the flush-mounted 

version of the box.

On the wall in a flush-mounte

version.

On the wall in the visible version.

On the window in the visible

version with the use of offsets.

On the window in the visible

version with the use of offsets at the

back and front (e.g., for a recess).

Summary of Contents for RAFF-I

Page 1: ...ASSEMBLY INSTRUCTION OF THE RAFF I EXTERNAL VENETIAN BLINDS...

Page 2: ...x when it is in a technically perfect condition No additional structural elements or non system fixings may be mounted on the box They can adversely affect the function of the EVB and lead to damage t...

Page 3: ...luminum guide on the EVB or window frame using assembly screws not included Plug from the front with the enclosed aluminum profile 10 5 10 5 ASSEMBLY OF THE GUIDING RAILS ON THE SIDE Drill mounting ho...

Page 4: ...ly screws not included in the set Plug from the front with the enclosed aluminum profile In the case of additional system reinforcements of the RAFF i boxes attach the box to the lintel Mounting screw...

Page 5: ...h the box cover plates to the side covers with rivets in accordance with the drawings below 10 15mm 25mm 25mm 10 15mm 10 15mm 50mm 10 15mm 50mm Alternative method of mounting the revision hatch The fr...

Page 6: ...x reinforcements Insert the PVC guide in such a way that the guides of the EVB shutter set are inside it TIPS Press the PVC guide so that it is seated in the aluminum MONOBLOK EKOOKNA guide The PVC gu...

Page 7: ...ASSEMBLY INSTRUCTION OF THE RAFF I EXTERNAL VENETIAN BLINDS...

Page 8: ...LINDS Guide MONOBLOCK FROM EKOOKNA Guide RAFF e A 45 27 mm 92 mm DIVIDER guide TYPE 4 22 5 mm 21 1 mm 40 mm 70 90 mm 20 mm 27 mm Embedment RAFF e 10 mm Embedment RAFF e 10 mm Embedment RAFF e 20 mm 92...

Page 9: ...ENT IN A MONOBLOCK GUIDING RAIL Application examples 1 INTERNAL EMBEDMENT 2 EXTERNAL EMBEDMENT 3 EXTERNAL AND INTERNAL EMBEDMENT When choosing the embedment please consider a use of an internal extern...

Page 10: ...ASSEMBLY INSTRUCTION OF THE RAFF I EXTERNAL VENETIAN BLINDS EMBEDMENT IN A RAFF e GUIDING RAIL When choosing the embedment please consider a use of an internal plaster carrier INSTALLATIE STYROFOAM...

Page 11: ...___________________________________________ ______________________________________________________________________________________ _____________________________________________________________________...

Page 12: ...www ekookna com Eko Okna S A ul Spacerowa 4 47 480 Kornice 06 2022...

Reviews: