INSTALLATION
NP-DK50-Nx2VTM-ADM-EN-1_06-2022
26
06/2022
Prior to installation, ensure that
the compressor is free of all
transport
packaging
and
stabilizers to avoid any risk of
damage to the product.
Remove all devices used to
secure the aggregates once the
compressor is installed and
levelled at the site of final
installation.
Fig. 8: Releasing the air pumps
Remove the transport stabilisers from
the air pumps (X, Y, Z) (Fig. 8).
DK50 4x2VT/M
– 8x mounts.
12. PNEUMATIC CONNECTION
Connect the compressed air lines at (C) and
connect the equipment to the compressed air
system from the G3/4” threaded outlet ball
valve.
Fig. 9: Pneumatic connection
Summary of Contents for DK 50 4X2VT/M
Page 1: ...DK50 4x2VT M DK50 6x2VT M USER MANUAL EN...
Page 2: ......
Page 13: ...PRODUCT DESCRIPTION 06 2022 13 NP DK50 Nx2VTM ADM EN 1_06 2022 Fig 2 Adsorption dryer...
Page 24: ...INSTALLATION NP DK50 Nx2VTM ADM EN 1_06 2022 24 06 2022 Fig 5 Handling the compressor module...
Page 31: ...INSTALLATION 06 2022 31 NP DK50 Nx2VTM ADM EN 1_06 2022 15 PNEUMATC DIAGRAMS DK50 4x2VT M...
Page 32: ...INSTALLATION NP DK50 Nx2VTM ADM EN 1_06 2022 32 06 2022 DK50 6x2VT M...
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ...NP DK50 Nx2VTM ADM EN 1_06 2022 112000595 0001...