
EKO INSTRUMENTS CO., LTD. I-V Curve Checker MP-11 Instruction Manual Ver.7
Pg. 44
3. Auto Measurement Setting
AUTO MEASUREMENT setting screen will appear by selecting [AUTO MEASUREMENT] from the Setting
Menu screen. After connecting the PV probes and setup the Sensor Unit, follow the next steps to take the
auto measurements.
Enter the [Start time], [End time], [Interval] information.
[Meas Par XX] indicates the parameter number which is selected for
the auto measurement.
To start the auto measurement, select [YES].
To cancel the measurement, select [NO].
※
Automatic measurement function beyond midnight cannot be set on main body.
※
Recommend not to measure over a couple of days in Auto Measurement mode
even if using
PC software because of instability of Operation System
※
During the auto measurement, the power auto off function will not be effective even if the
Battery Receptacle Box is in use.
※
The measurement data are saved sequentially from 0 (zero) to 300 in the Main Unit memory.
When the memory exceeds 300, the data are overwritten with newer data from 0 (zero). It is
recommended to download and save the data to PC after use to clear the Main Unit memory,
and manage the data on the PC as much as possible.
4. System Menu
The System Menu screen appears when [SYSTEM] is selected from the Setting Menu screen.
Below are the options available on the System menu screen.
[DATE & TIME SET]
Date & time setting
[LCD CONTRAST]
LCD contrast adjustment
[LOADING SENSOR DATA]
Downloading Sensor Unit data to the
Main Unit
Auto Measurement Setting
Start time
09:00:00
End time
16:00:00
Interval
00 minutes
Meas Par 03:EKO 003
AUTO MEASUREMENT
Auto Measurement Start/Cancel
NO
YES
Start measurement?
03
AUTO MEASUREMENT
System Menus
Summary of Contents for MP-11
Page 1: ......
Page 95: ...EKO INSTRUMENTS CO LTD I V Curve Checker MP 11 Instruction Manual Ver 7 Pg 94 11 4 Dimensions...
Page 96: ......