background image

- 12 -

For this step, you will need:

Phillips Head Screwdriver

STEP 2

After placing the water block, use eight (8) M2.5 x 4 AX1 screws and 
PVC washers to tighten the GPU PCB. Tighten the screws evenly 
using the Phillips-head screwdriver. EK recommends you start 
tightening the screws around the GPU core first and then continuing 
outward to prevent damaging the GPU. Always use a plastic washer 
under each screw.

After attaching the PCB, use one (1) M2.5 x 6 AX1 Screw in 
combination with (1) M2.5 Nut and one (1) additional M2.5 x 4 AX1 
Screw to secure the I/O Bracket. 

STEP 2

M2.5 NUT

For this step, you will need:

EK-Plug Out Spludger Tool

M2.5 PVC WASHER

M2.5 x 4 AX1 SCREW

M2.5 x 4 AX1 SCREW (WITHOUT PVC WASHER)

M2.5 x 6 AX1 SCREW

STEP 3

Place the M2.5-M3 x 6.6 Standoff in each of the ten (10) mounting 
holes of the standoff M3.5-M2.5 x 11.3 (as shown in the image) and 
tighten them evenly with the EK-Plug-Out Spludger Tool.

Do not use excessive force!

STEP 3

M2.5-M3 x 6.6 mm 
STANDOFF

Summary of Contents for 3831109897287

Page 1: ...USER GUIDE GPU WATER BLOCK EK Quantum Vector FTW3 RTX 3090 Ti ABP Set D RGB...

Page 2: ...startusingthisproduct pleasefollowthesebasicguidelines Carefully read the manual before beginning with the installation process Remove your graphics card from the computer for the safest mounting proc...

Page 3: ...OOLER 7 PREPARING THE WATER BLOCK FOR INSTALLATION 8 CLEANING THE PCB 8 CUTTING AND PLACING THERMAL PADS 10 APPLYING THERMAL COMPOUND 11 ATTACHING THE WATER BLOCK 11 ATTACHING THE ACTIVE BACKPLATE 13...

Page 4: ...s 3830046996794 Thermal Grease 1 pc M3x10 AX1 Screw 1 pc EK Quantum Vector2 FTW3 RTX 3090 Ti ABP Set D RGB M2 5x4 AX1 Screw 13 pcs Polyamid Washer M2 5 0 5mm 13 pcs Terminal OR Vector2 14x1 mm 2 pcs 1...

Page 5: ...5 WATER BLOCK DIMENSIONS 95 9 mm 123 9 mm 318 2 mm 155 mm 142 5 mm 41 mm 35 5 mm...

Page 6: ...5438 Stand out Acetal 1 12 100663 EK Badge 2 13 105434 LED Cover Nat elox 2 14 8208 Screw M3 x 8 7991DIN 2 15 5064 Main O ring 140 x2 mm 1 16 104093 Standoff M2 5 M3 x 6 6 10 17 104105 Screw AX1 M3 x...

Page 7: ...ck Cooler Backplate from the PCB Use the Phillips head screwdriver to remove the nine marked screws to detach the Stock Cooler from the PCB of the GPU Carefully detach the PCB from the stock cooler an...

Page 8: ...er that remove all remaining stock thermal pads from the PCB STEP 2 STEP 1 First remove the terminal badge which is attached to the terminal with two magnets Under the badge unscrew three 3 screws M4...

Page 9: ...M2 5 M3 x 6 6 STANDOFF STEP 3 Unscrew ten 10 M2 5 M3 x 6 6 standoffs with the included tool EK Plug out Spludger Tool Make sure not to unscrew the M3 5 M2 5 x 11 3 standoff In case the M3 5 M2 5 x 11...

Page 10: ...the VRM components such as COILs MOSFETs and drivers You must remove the protective foil from both sides of the thermal pad before installation Replacement thermal pads Thermal Pad F 1 0 mm 120 x 16 m...

Page 11: ...or performance STEP 1 APPLYING THERMAL COMPOUND For this step you will need ATTACHING THE WATER BLOCK STEP 1 Carefully position the water block with preinstalled standoffs on the graphics card During...

Page 12: ...r under each screw After attaching the PCB use one 1 M2 5 x 6 AX1 Screw in combination with 1 M2 5 Nut and one 1 additional M2 5 x 4 AX1 Screw to secure the I O Bracket STEP 2 M2 5 NUT For this step y...

Page 13: ...Once cut to size thermal pads should be placed on the PCB as illustrated EK made sure to provide you with more than an adequate quantity of thermal pads to complete this Step Replacement thermal pads...

Page 14: ...d correctly STEP 2 For this step you will need Phillips Head Screwdriver O RING 14 x 1 mm Allen Key 2 5mm ACTIVE BACKPLATE STEP 3 Place ten 10 M3 x 10 AX1 screws into the water block standoffs and tig...

Page 15: ...might damage your card or water block FITTINGS AND TUBING STEP 1 Screw in two 2 G1 4 threaded male fittings Attach the liquid cooling tubes and connect the water block to the cooling loop Do not forge...

Page 16: ...ponents was successful we recommend you perform a leak test for 24 hours When your loop is complete and filled with coolant connect the pump to a PSU outside of your system Do not connect power to any...

Page 17: ...n the instructions manual This warranty does not confer rights other than those expressly set out above and does not cover any claims for consequential loss or damage This warranty is offered as an ex...

Page 18: ...e with TECHNICAL SPECIFICATIONS AND WATER BLOCK PARTS where you can find the EAN number of each part you might need Include the EAN number with quantity in your request Mounting Mechanism EAN can be f...

Reviews: