2 General
Installation
Preparation for installing the LCD monitor includes following steps:
•
Removal of all packaging materials
•
Checking of components for damage
•
Comparison of components received with those listed on the delivery note
•
Connection to the computer system and power supply
•
System integration under consideration of technical and ergonomic aspects
2.1
Removal of Packaging and Checking of Component Parts
After unpacking all delivered components, they should be checked for completeness and for possible
shipping damage (visual inspection). If any parts are missing or damaged, please contact your local
dealer. Have your packing list number, serial number of the unit and a description of the problem
available when calling.
The original packaging should be kept for future shipping of the product.
2
General Installation
11
Summary of Contents for Raptor SQ2801
Page 2: ......
Page 14: ...Fig 4 Raptor SQ2801 Dimensions Chassis version Rear View 14 2 General Installation ...
Page 15: ...Fig 5 Raptor SQ2801 Dimensions Chassis version Side View 2 General Installation 15 ...
Page 17: ...Fig 7 Raptor SQ2801 Dimensions Desktop version Rear View 2 General Installation 17 ...
Page 18: ...Fig 8 Raptor SQ2801 Dimensions Desktop Side View 18 2 General Installation ...
Page 20: ...Fig 10 Raptor SQ2801 Dimensions Panel mount Side View 20 2 General Installation ...
Page 21: ...Fig 11 Raptor SQ2801 Dimensions Panel mount Back View 2 General Installation 21 ...
Page 59: ...1st Edition October 2007 03V22230A1 U M SQ2801 EN ...