Page 4 of 12 

Drawing   : - TPC390 
Issue 

: - 5 

Date 

: - 17/01/17 

OPERATION 

 

The  following  procedures  should  be  followed  to  test  the  ECO85  for  correct 
operation: 
 

 

1. 

After  unpacking,  examine  all  external  features  to  confirm  damage-
free shipment. Report all defects and damage at once.  Connect the 
power  cable  to  a  grounded  electrical  outlet.  Connect  the  drainage 
outlet  to  a  suitably  sized  hose  and  run  the  hose  to  a  permanent 
drain. 

 
 

2. 

Check dehumidification process as follows: 

 

 

 

A.  Place unit on a level surface. 
B.  Start up unit by connection to mains supply and switching the on 

off switch to the ‘I’ position. 

C.   Check that the compressor is running. 

 

D.  Leave the machine running for 15 minutes. 
E.  Observe the evaporator coils through the evaporator filter panel 

 

i.  If the air temperature is below 80° F, an even coating of 

frost should cover the entire evaporator coil 

ii.  If the air temperature is above 80° F, frost and/or droplets 

of  condensed  water  should  cover  the  entire 
evaporator coil.  

  

F.

  After  continuous  running  time  of  approximately  55  minutes,  the 

unit  will  enter  “Hot  Gas”  defrost  mode  for  5  minutes  and  then 
automatically return to normal operation.

 

 

If, after carrying out the above procedures, the unit does not appear to 

function properly, refer to the 

Trouble Shooting

 section, which follows, 

or contact the Factory Service Center. 

 
 
 

 
 
 

After using the ECO85, turn it off for 5 minutes to allow the condensate on the 
coils to drain into the pump reservoir, then turn it back on and press the 
momentary purge switch for twenty to thirty seconds to evacuate the water 
from the pump reservoir.

TO ENSURE CONTINUED FULL EFFICIENCY OF THE 

DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE 

PERFORMED AS FOLLOWS: 

CAUTION: 

ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT 

LEAST FIVE MINUTES BEFORE RESTARTING. 

Summary of Contents for ECO85

Page 1: ...Limited Unit 5a Commercial Yard Settle North Yorkshire BD24 9RH Get In Touch Call 0845 6880112 Email info adremit co uk Page 1 of 12 Drawing TPC390 Issue 5 Date 17 01 17 ECO85 INDUSTRIAL DEHUMIDIFIER...

Page 2: ...y removed during the cooling phase plus the additional heat generated by the compressor The air is therefore discharged from the dehumidifier at a slightly higher temperature with a lower absolute hum...

Page 3: ...he refrigeration system is hermetically sealed The Global Warming Potential GWP of refrigerants used in products manufactured by Ebac Industrial Products Ltd is as follows R134a 1300 R407c 1610 For ty...

Page 4: ...h the evaporator filter panel i If the air temperature is below 80 F an even coating of frost should cover the entire evaporator coil ii If the air temperature is above 80 F frost and or droplets of c...

Page 5: ...ator coil should be evenly frost coated across its surface At temperatures above 80 F the coil may be covered with droplets of water rather than frost Partial frosting accompanied by frosting of the t...

Page 6: ...machine use the crimped and brazed charging stub attached to the side of the refrigerant compressor The charging stub should be crimped and rebrazed after servicing NEVER allow permanent service valv...

Page 7: ...ittle or no water extraction 1 Insufficient air flow 2 Compressor fault 3 Loss of refrigerant gas 1 Check all of the above 2 Contact the Factory Service Center 3 Contact the Factory Service Center Lit...

Page 8: ...ry Tube 3014254 2 x 24 4 Solenoid Valve 3020837 1 5 Filter Dryer 3020909 1 6 Compressor 3944932 1 7 Solenoid Coil 3030451 1 8 Run Capacitor 3030908 1 9 Filter 2029826 1 10 Mains Lead 3031231 1 11 Fan...

Page 9: ...azard This product contains fluorinated greenhouse gases covered by the Kyoto Protocol The refrigeration system is hermetically sealed The Global Warming Potential GWP of refrigerants used in products...

Page 10: ...Our Address Puravent Adremit Limited Unit 5a Commercial Yard Settle North Yorkshire BD24 9RH Get In Touch Call 0845 6880112 Email info adremit co uk Page 10 of 12 Drawing TPC390 Issue 5 Date 17 01 17...

Page 11: ...Our Address Puravent Adremit Limited Unit 5a Commercial Yard Settle North Yorkshire BD24 9RH Get In Touch Call 0845 6880112 Email info adremit co uk Page 11 of 12 Drawing TPC390 Issue 5 Date 17 01 17...

Page 12: ...uckland County Durham DL14 9AD Tel 44 0 1388 664400 Fax 44 0 1388 662590 www eipl co uk sales eipl co uk American Sales Office Ebac Industrial Products Inc 700 Thimble Shoals Blvd Suite 109 Newport Ne...

Reviews: