EINHELL RT-SC 570 L Operating Instructions Manual Download Page 10

GB

10

No-Load operation

Sound pressure level L

pA

94,5 dB

Sound power level L

WA

107,5 dB

6. Before using for the first time

The machine must be set up so that it stands
firmly, i.e. it must be securely screwed to a work
bench, the base frame supplied in delivery, or
similar.

All covers and safety devices must be correctly
attached before the machine is used for the first
time.

The cutting wheel must rotate smoothly.

Check that the voltage on the rating plate is the
same as your supply voltage before you connect
the machine to the power supply.

7. RCD plug (Fig. 16)

Connect the RCD plug (41) to the power supply.
Press the reset button (42) and the control lamp (43)
will begin to shine. Press the test button (44) to
check the function of the RCD plug. If everything is
working properly the control lamp (43) will go out and
the contact to the power supply will be interrupted.
The RCD plug triggers at a fault current of 30 mA.
Defective RCD plugs must be replaced by a qualified
electrician.
Press the reset key (42) again in order to be able to
start up the machine.

8. Assembly and operation (Fig. 3/4/5)

8.1 Fitting the hose and cable guide (Fig. 17)

8.2 Assembly of the sub-frame and cooling water

pump (Fig. 2-4)

Secure the feet (1) to the water trough using the
thumb screws (12). 

Place the complete tile cutter into the trough (3).

Place the cooling water pump (13) in a suitable
position in the water trough and secure it to the
base of the trough with the suction cups. The
pump, cable and cooling water hose (14) must
not be able to get into the cutting area.

Fill with water until the pump (13) is completely
immersed in water.

Remove the star handle screw (11) and spacer
(40).

Important: Before you lift the machine out of the
trough or transport it, the cutting unit must be
secured again with the star handle screw (11) and
spacer (40).

8.3 ON/OFF switch (Fig. 6)

To switch on, press the “1” on the ON/OFF
switch (16).

Before you begin cutting, wait until the cutting
wheel has reached maximum speed and the
cooling water pump (13) has started supplying
the cutting wheel with water.

To switch off, press the “0” on the switch (16).

8.4 90° Cutting (Fig. 7/8)

Loosen the star grip screw (27).

Set the angle stop (5) to 90° and retighten the
star grip screw (27).

Retighten the screws (28) to fasten the angle
stop (5).

Move the machine head (29) to the far end with
the handle (9).

Position the tile against the rail fence (6) on the
angle stop (5).

Switch on the tile cutting machine.

Caution: 

Always wait until the cooling water has

reached the cutting wheel (2) first.

Move the machine head (29) slowly and
smoothly forward through the tile with the handle
(9).

Switch off the tile cutting machine after
completion of cutting.

8.5 45° Diagonal cut (Fig. 9)

Set the angle stop (5) to 45°.

Cut as described in 8.4

8.6 45° Lengthwise cut, “jolly cut” (Fig.10)

Loosen the star grip screw (10).

Tilt the guide rail (7) to the left to 45° on the
angle scale (17).

Retighten the star grip screw (10).

Cut as described in 8.4.

Anleitung_RT_SC_570_L_SPK7:_  04.06.2008  13:55 Uhr  Seite 10

Summary of Contents for RT-SC 570 L

Page 1: ... Operating Instructions Stone Cutting Machine Art Nr 43 014 45 I Nr 01018 RT SC 570 L Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 1 ...

Page 2: ...2 Read and follow the operating instructions and safety information before using for the first time Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 2 ...

Page 3: ...3 1 2 3 2 11 8 9 6 7 1 5 10 3 4 14 13 3 Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 3 ...

Page 4: ...4 4 5 8 9 7 6 27 28 12 11 40 5 6 27 29 9 16 Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 4 ...

Page 5: ...5 12 10 11 14 15 13 17 10 37 30 30 30 36 31 35 34 2 8 Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 5 ...

Page 6: ...6 18 16 17 20 21 19 43 46 47 50 46 49 49 41 48 45 49 49 49 46 49 46 41 42 44 42 43 44 Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 6 ...

Page 7: ...7 22 51 50 Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 7 ...

Page 8: ...for setting the angle 11 Star grip screw for securing during transportation 12 Thumb screws 13 Cooling water pump 14 Hose 15 Motor 16 ON OFF switch 17 Angle scale 2 Items supplied 앬 Stone cutting machine 앬 Trough 3 앬 Cooling water pump 13 앬 Angle stop 5 앬 Feet 1 3 Proper use The stone cutting machine can be used for normal cutting work on concrete slabs cobblestones marble and granite slabs bricks...

Page 9: ...nted cutting wheels 앬 Caution The cutting wheel runs on after the machine is switched off 앬 Never apply side pressure to the diamond cutting wheel in order to bring it to a halt 앬 Caution The diamond cutting wheel must be cooled with water at all times 앬 Always pull out the power plug before changing the cutting wheel 앬 Use only suitable diamond cutting wheels 앬 Never leave the machine unattended ...

Page 10: ... to the base of the trough with the suction cups The pump cable and cooling water hose 14 must not be able to get into the cutting area 앬 Fill with water until the pump 13 is completely immersed in water 앬 Remove the star handle screw 11 and spacer 40 Important Before you lift the machine out of the trough or transport it the cutting unit must be secured again with the star handle screw 11 and spa...

Page 11: ...er with the screw 47 To do so undo the screw 47 by a few turns The laser 45 can now be moved and adjusted vertically and horizontally on the adapter 48 Tighten screw 47 again when you are satisfied with the adjustment 9 2 Use as a laser level unit Fig 18 21 Remove the screw 47 The laser 45 can now be taken off the adapter 48 and used as an external laser level unit The laser 45 is equipped with tw...

Page 12: ...isposed of as special waste Ask your dealer or your local council 13 Battery disposal Batteries contain materials that are potentially harmful to the environment Never place batteries in your household refuse in fire or in water Batteries should be collected recycled or disposed of by environment friendly means Send your old batteries to ISC GmbH Eschenstrasse 6 in D 94405 Landau You can then be s...

Page 13: ...porarily 앬 The product is intended solely for use at connection points that a do not exceed a maximum permitted supply impedance Z or b have a continuous current carrying capacity of the mains of at least 100 A per phase 앬 As the user you are required to ensure in consultation with your electric power company if necessary that the connection point at which you wish to operate the product meets one...

Page 14: ...h the express consent of ISC GmbH Technical changes subject to change DISTRIBUTOR A S CENTER in Korea Kubo Tech Inc D Block Room No 35 310 Guro Machinery Tools Shopping Center 604 1 Guro dong Guro gu Seoul 152 050 Korea Tel 02 2675 0942 0943 Fax 02 2675 0944 e Mail smakorea yahoo co kr Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 14 ...

Page 15: ...15 Anleitung_RT_SC_570_L_SPK7 _ 04 06 2008 13 55 Uhr Seite 15 ...

Page 16: ... device e g sand stones or dust effects of force or external influences e g damage caused by the device being dropped and normal wear resulting from proper operation of the device The guarantee is rendered null and void if any attempt is made to tamper with the device 3 The guarantee is valid for a period of 2 years starting from the purchase date of the device Guarantee claims should be submitted...

Reviews: