WE RECOMMEND THAT YOUR ELECTRICITY MONITOR IS INSTALLED BY A QUALIFIED ELECTRICIAN
IN THE BOX
HARDWARE INSTALLATION
6
5
Your ecotouch management system contains:
1 x ecotouch display
1 x ecosocket
1 x transmitter
1 x elink software CD
1 x mini CT sensor
1 x USB cable
PRIOR TO INSTALLATION
The efergy ecotouch system is installed by clipping the mini CT sensor around the feed wire of
your electric panel. In Australia the standard residential voltage is 240V.
Note -
For a 240V panel (typical residential electric panel) power is measured using one mini CT
sensor. For different voltages, please change during the Monitor Setup stage (see page 13).
Installation for Three Phase Panels
The ecotouch system is installed by clipping the mini CT sensors around the feed wire of your
electric panel. In the case of a commercial or industrial three phase panel or service, you must
use three mini CT sensors to measure all three phases. Simply order an additional two mini
CT sensors from your dealer. Identify the three power wires providing service to your electric
panel. Open and place one sensor around each of the three main feed wires.
Installing Transmitter for Three Phase
Plug the three mini CT sensor cables into the transmitter. Mount the transmitter on the wall next
to the electric panel. This will make it easier to replace the batteries. Readings for a three phase
system may not be accurate depending on connection and loading system.
EXIT
ENERGY MANAGEMENT
SOFTWARE
For Windows XP, Vista, Windows 7 ( 32 & 64 bit )
Mac OSX 10.5+
System Requirements:
Min 800x600 or above - Java V6.0+
Adobe Air V1.5+
2
.
0
10 / 15 / 20s
ELECTRICITY MONITORING
TRANSMITTER