Section
IV:
Maintenance
4.0.MAI.SL-105
contact with the jib lockout valve roller. The roller should be depressed by the valve ramp so
that 1/8” to 3/16” of the roller is exposed from the end cap (see illustration below).
ADJUSTMENT
Should the jib lockout valve need adjustment the first step will be to loosen the mount bracket
screws (see illustration above). Reposition the jib lockout valve with respect to the valve ramp
by turning the adjustment screw on the valve mount bracket as follows:
Clockwise Adjustment – Moves the jib lockout valve closer to the valve ramp
Counter-Clockwise Adjustment – Moves the jib lockout valve away from the valve ramp
Once the valve has been moved back into proper adjustment, then tighten up the mount bracket
screws.
PART NUMBER &
SPECIFICATION
SwapLoader
Pt. No.
Work Port Size
Spool Type
21P28
3/4-16 ORB (SAE 8) 2-Way, 2-Position N.C.
Please contact your SwapLoader Distributor or SwapLoader USA should you have any
questions regarding this procedure.
4-6
Summary of Contents for swaploader SL-105
Page 2: ......
Page 28: ...This Page Intentionally Left Blank ...
Page 37: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 25 ...
Page 38: ...This Page Intentionally Left Blank ...
Page 42: ...This Page Intentionally Left Blank ...
Page 46: ...This Page Intentionally Left Blank ...
Page 70: ...This Page Intentionally Left Blank ...
Page 81: ......
Page 82: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 Rev 05 10 2022 ...