Section
II:
Installation
2.0.INS.SL-105
CONTROLS INSTALLATION – MANUAL
1. Attach the valve mount bracket
(
Pt. No. 10H51
) to the Main
Frame as indicated on
Pg. 5-11
with the fasteners provided (see
Pg. 5-7
).
2. Mount the hydraulic control valve
assembly (
Pt. No. 21P32
) to the
valve mount bracket as shown on
Pg. 5-11
with the fasteners
provided.
3. Install the hydraulic adapters,
connect the hydraulic tubing (
Pt.
Nos. 11P09
,
11P10
, &
13P79
) to
the control valve assembly as
indicated on
Pg. 5-9
. The tubing
should be supported by the clamp
assemblies that are provided in
the Loose Parts Box (see
Pg. 5-
7
).
4. Determine the best location in the
cab for the control levers (
Pt. No.
20P08
). The location should be
such that the controls can be
easily reached while operating the
truck. A control lever console (
Pt.
No. 20P09
) is provided to facilitate
the mounting of the control levers.
5. Assemble and install the control
lever console (see
Fig. E
).
Typically, the console is fastened
to the floor of the cab and the
control cables are routed through
additional holes drilled in the floor.
Your installation may require that
additional brackets be fabricated,
or other modifications made.
6. Attach the control cables to the control levers and route the cable through the holes in
the cab. Install the control levers in the console. Levers should be installed such that
when the levers are pushed forward the control cable is extended. See
Pg. 5-11
(Manual Control Assembly) for control lever orientation.
7. Route the cables to the control valve location and attach them to the control valve with
the bonnet connection kits provided (
Pt. No. 20P10
). See the following instruction sheet
for installation procedures. The control cables supplied are 84 inches long. Your
mounting may require different length control cables, which can be purchased locally or
through SwapLoader. Take proper care when routing the control cables, as a good
Figure
E
2-4
Summary of Contents for swaploader SL-105
Page 2: ......
Page 28: ...This Page Intentionally Left Blank ...
Page 37: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 25 ...
Page 38: ...This Page Intentionally Left Blank ...
Page 42: ...This Page Intentionally Left Blank ...
Page 46: ...This Page Intentionally Left Blank ...
Page 70: ...This Page Intentionally Left Blank ...
Page 81: ......
Page 82: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 Rev 05 10 2022 ...