PROFIVE® NUCE_C 54 W
Hardware Reference Manual – P – Revision 1
E.E.P.D. GmbH | Gewerbering 3 | 85258 Weichs
Copyright ©2020|2021 E.E.P.D. GmbH.
All rights reserved.
12
10/2021 Revision 1.7
Assembly
The board must be mounted in a stable case. The mechanical mounting points
according to chapter 3.1 must be used.
The available sockets and connector for system build-up are specified in
chapter 4.
E.E.P.D. recommends M3 Torx screws with a screw locking coating and a
maximum tightening torque of 0.5 Nm
.
A
ss
e
mb
ly